Installation
SN2004, SN2024 - Infrared
Bradley •
215-1071 Rev. N: ECO 20-00-015
8/24/2020
5
A
Remove Access panel and
with the help of another
person, place unit in position
against wall .
Rough-in of plumbing lines and wall braces must be completed before
unit can be properly installed.
C
Install suitable wall anchors (supplied
by installer) for 3/8" bolts at the marked
locations . Secure unit to wall .
Water Supply Gang
Valve Assembly
B
Ensure unit is level, shimming floor unit if
necessary . Mark the wall anchor locations .
A
Connect stops to hot and cold water supply .
Connect one end of each supply hose to a stop
and the other end to the hot and cold inlets of
the Navigator TMV .
B
OPTIONAL TEMPERED LINE CONNECTION: Connect
stop to supply . Connect one end of the supply hose to the
stop and the other end to the tempered line adapter in the
gang valve assembly as shown .
Do not turn on water until
Step 4 is completed!
Red Tube
(to Aerator)
Green Tube
(to Aerator)
Black Tube
(to Aerator)
Yellow Tube
(to Aerator)
Hot Supply Inlet
Cold Supply Inlet
Navigator TMV
(S01-526)
Braided
Hose
OPTIONAL
Tempered Line
Adapter Assembly
(S39-804)
Stop Valve
Water Supply
Gang Valve
Assembly
1
Install Unit
2
Connect Water Supply to Valve Assembly