2
S19294HB, S19294HBT Installation
3/27/2013
Bradley • 215-1743 Rev. B; ECN 13-05-014
IMPORTANT
Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized
shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum 30 PSI (0.21 MPa) flowing pressure.
Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance
with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per ANSI
Z358.1.
For questions regarding the operation/installation of this product, visit bradleycorp.com
or call 800.BRADLEY (800.272.3539).
Product warranties may also be found under ”Products” at bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
•
•
•
•
P.
O.
B
ox
3
09
, M
en
om
on
ee
F
all
s,
W
I 5
30
51
R
TE
ST
TH
IS
U
NIT
E
AC
H
W
EE
K
Te
st-
op
era
te
va
lv
e(s
) e
ac
h
we
ek
a
nd
s
ig
n
be
lo
w.
Re
po
rt
an
y
m
alf
un
cti
on
s im
m
edi
ate
ly.
Ve
ntil(e)
wö
ch
en
tlic
h im
Te
stb
etrieb
p
rü
fe
n,
b
es
tä
tig
t
du
rc
h
Un
te
rs
ch
rift
. J
eg
lic
he
S
tö
ru
ng
so
fo
rt
m
eld
en
.
Date
Datum
Date
Signed
Unter
sc
hrift
Sign
e
Date
Date
Date
Signed
Signed
Signed
DIE
SE
S
GE
RÄ
T
1S
T W
ÖC
HE
NT
LIC
H
ZU
P
RÜ
FE
N.
ES
SA
I H
EB
DO
M
AD
AI
RE
Te
st le
fo
nc
tio
nn
em
en
t d
es
valve
s
ch
aq
ue
s
em
ain
e
et
sig
ne
e
n
ba
s.
S'il
y
à
qu
elq
ue
ch
os
e
qu
i n
e
va
p
as
fa
it
un
rap
po
rt im
m
éd
ia
te
m
en
t.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
Supplies Required:
•
Piping to ½" NPT water supply inlet on unit
• Bolts for cabinet mounting
• P
ipe sealant
•
Sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with
local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from
Bradley Corporation.