background image

P.O. Box 309, Menomonee Falls, WI  USA 53052-0309
PHONE 1-800-BRADLEY FAX (262) 251-5817
http://www.bradleycorp.com

Installation 

215-161 Rev. L; EN 06-532E
© 2007 Bradley Corporation
Page 1 of 5

4/26/07

S19-240, S19-240FW

Unmounted Eyewash and
Eye/Face Wash - Laboratory
Application

Table of Contents

Pre-Installation Information  . . . . . . . . . . . . . . . .2
Installation Instructions . . . . . . . . . . . . . . . . . . . .3
S19-240 Components and Parts List . . . . . . . . . .4
S19-240FW Components and Parts List . . . . . . .5

S19-240

S19-240FW

Содержание S19-240

Страница 1: ...ion 215 161 Rev L EN 06 532E 2007 Bradley Corporation Page 1 of 5 4 26 07 S19 240 S19 240FW Unmounted Eyewash and Eye Face Wash Laboratory Application Table of Contents Pre Installation Information 2 Installation Instructions 3 S19 240 Components and Parts List 4 S19 240FW Components and Parts List 5 S19 240 S19 240FW ...

Страница 2: ...erify proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this product visit www bradleycorp com or call 1 800 BRADLEY Produc...

Страница 3: ...the grip pad and turn the pipe with the wrench NOTE The top of the eyewash heads should be 33 45 838mm 1143mm from the floor Step 2 Connect water supply 1 Connect water supply piping supplied by installer to the 1 2 IPS inlet on the eyewash see Figure 1 2 Open the water supply lines Test for leaks and adequate water flow 3 Mount the safety sign to the wall using sign mounting hardware supplied by ...

Страница 4: ...Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y à quelque chose qui ne va pas fait un rapport immédiatement 1 Figure 2a Prepack S45 122 includes Items 4 4 1 5 8 Prepack S45 123 includes Items 4 1 5 8 1 S05 063B 1 Eyewash Assembly 1 1 S05 091 1 E...

Страница 5: ...T 1ST WÖCHENTLICH ZU PRÜFEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y à quelque chose qui ne va pas fait un rapport immédiatement 1 Figure 2b 5 Installation S19 240 S19 240FW Bradley Corporation 215 161 Rev L EN 06 532E 4 26 07 1 S05 064 1 Eye Face Wash Assembly 1 1 S05 091P 1 Eyewash Yoke 1 2 S05 135 1 Eye Face Wash Head 1 3 S53 063 2 Dust Cover 1 ...

Отзывы: