Installation 

215-1568 Rev. B; ECN 08-518
© 2008 Bradley Corporation
Page 1 of 7 

9/29/08

S19-125SBF

S19-125SFMBF

Barrier Free Recess-Mounted 
Drench Shower 

Table of Contents

Pre-Installation Information  . . . . . . . . . . . . . . 2
Assembly of Components  . . . . . . . . . . . . . . . 3
Service Parts  . . . . . . . . . . . . . . . . . . . . . . . . . 3
Cabinet Dimensions . . . . . . . . . . . . . . . . . . . . 4
Rough-Ins. . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Installation  . . . . . . . . . . . . . . . . . . . . . . . . . 6–7

www.bradleycorp.com

PUSH

PUSH

TO

TO

ACTIVATE

ACTIVATE

SHOWER

SHOWER

www.bradleycorp.com

PUSH

PUSH

TO

TO

ACTIVATE

ACTIVATE

SHOWER

SHOWER

S19-125SBF

S19-125SFMBF

Содержание S19-125SBF

Страница 1: ...of 7 9 29 08 S19 125SBF S19 125SFMBF Barrier Free Recess Mounted Drench Shower Table of Contents Pre Installation Information 2 Assembly of Components 3 Service Parts 3 Cabinet Dimensions 4 Rough Ins...

Страница 2: ...with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of thi...

Страница 3: ...nctions immediately Ventil e w chentlich im Testbetrieb pr fen best tigt durch Unterschrift Jegliche St rung sofort melden Date Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed...

Страница 4: ...125SFMBF Installation 9 29 08 Bradley Corporation 215 1568 Rev B ECN 08 518 S19 125 Series Cabinet Dimensions 14 357mm 7 11 16 195mm 8 7 16 214mm 2 1 4 57mm 10 254mm 12 1 2 318mm 7 178mm 3 76mm Side...

Страница 5: ...38 965mm to 48 1219mm from floor S19 125SBF S19 125SFMBF Ceiling hole 1 3 8 35mm Wall opening 6 152mm wide 10 254mm high Piping and adequate supports by installer 38 965mm to 48 1219mm from floor Ceil...

Страница 6: ...tion 9 29 08 Bradley Corporation 215 1568 Rev B ECN 08 518 S19 125SBF S19 125SFMBF Piping and adequate supports by installer Piping and adequate supports by installer 2 Installation NOTE Use teflon ta...

Страница 7: ...7 Installation S19 125SBF S19 125SFMBF Bradley Corporation 215 1568 Rev B ECN 08 518 9 29 08 www bradleycorp com 114 090 To Showerhead Connect supply piping 1 NPT supply line 3 Connect Water Supply...

Отзывы: