background image

For using this product properly and safely, please follow the

contents of the Installation and Operation Manual to install.

It is suggested that this Electric Stand applies to the 55-75

inch intelligent panel.

This stand can carry a maximum weight of 100KG.

Содержание ProColor IFPD

Страница 1: ...perly and safely please follow the contents of the Installation and Operation Manual to install It is suggested that this Electric Stand applies to the 55 75 inch intelligent panel This stand can carr...

Страница 2: ...r 2pcs G Control pad 1pcs H AC Power Cable 1pcs I USB transferable Cable 1pcs J AC Power transferable Cable 1pcs Other accessories Hexagon socket countersunk head screws KM10 25 4pcs Cross recessed po...

Страница 3: ...2 Step1 Install the Wall Mount C on the lifting column B figure 1 B C figure 1...

Страница 4: ...3 Step2 Install the shelf D on the lifting column B figure 2 figure 2...

Страница 5: ...4 Step3 Connect the power cable between the lifting column B and the base A install the lifting column and tighten the screws figure 3 A figure 3 3...

Страница 6: ...tric Stand the control pad and the AC power cable should be connected to the Electric Stand and connected to the power supply figure 5 G H figure 5 4 Step4 Install the Control pad box E on the lifting...

Страница 7: ...18 or F figure 7 6 Step6 Turn the Wall Mount C from horizontal to vertical For details refer to the Quick Start Guide figure 6 figure 6 Recommended mounting hole Panel size K all 55 K 8 18 65 K 15 18...

Страница 8: ...erable Cable and the USB transferable Cable in user can interact with the Interactive Flat Panel figure 9 I J figure 9 8 Step8 Hang the Interactive Flat Panel to the Electric Stand by Wall Mount and t...

Страница 9: ...8 10 Step10 Done as shown in figure 10 figure 10...

Отзывы: