Installation instructions
7
TR1000 12 B – 6 720 876 017 (2017/08)
• This appliance can be used by
children
aged 8 years and older as well
as by persons with diminished bodily, sensory or mental perception,
or those who lack knowledge or experience, if they are monitored or
have received instruction concerning use and comprehend the
possible dangers that can result.
Children
may not play with the
appliance. Cleaning and
maintenance by the user
may not be
performed by unsupervised
children
.
• Keep children away from the appliance.
• Please monitor children to ensure that they do not play with the
appliance.
• The mixer and the warm water pipe may be hot. Please inform and
instruct children appropriately.
• Do not use aggressive or abrasive cleaning detergents!
• Do not use a steam cleaner.
• The appliance is only to be descaled by a suitably qualified specialist.
Congratulations on purchasing this BOSCH appliance. You have
acquired a top-quality product, which will give you a lot of enjoyment.
Please read this installation and operating instruction manual
carefully, then act accordingly! Store for future reference.
2
Installation instructions
Install the continuous-flow heater as described in the illustrated
section. Observe the instructions in the text.
The illustrations can be found in the centre of the instruction manual.
2.1
Installation
I. List of items supplied
1.
Continuous-flow heater
2.
Installation template
3.
Connection piece for hot water
4.
Washer, red Ø 15 mm
5.
Connection piece for cold water
6.
Washer, Ø 24 mm
7.
Mounting bolt
8.
Wall plug
9.
Securing nut
10.
Threaded bushing
11.
Cable grommet
II. Wall mounting
There are two ways in which the continuous-flow heater can be mounted
on the wall:
• Using the mounting bolt. Unevenness in the wall up to a depth
of 25 mm can be compensated for.
• Making use of the holes that were drilled for the old heater: Use the
mounting template to establish whether the existing holes line up
properly.
The following describes the installation procedure using the mounting
bolt.
Marking the point for mounting the heater and selecting the
opening for the connecting cable (Fig. A)
CAUTION:
Important!
Make sure that the connecting cable is isolated from the mains electricity
supply!
• Place hole
3
in the mounting template over the cold-water inlet.
• Select the most suitable hole through which the connecting cable is
be fed. The connecting cable must pass through one of the six holes
marked
14..
. Terminal
BZ45Z20M
can be used if the cable is fed into the
continuous-flow heater through one of the bottom holes marked
14a
.
• Mark the point
12
at which the mounting bolt is to be inserted.
Fitting the mounting bolt and attaching the pipe connecting
pieces (Fig. B)
Open up the heater (Fig. C)
Punching out the holes at the rear of the heater for the mounting
bolt and the connecting cable
WARNING:
Important:
When mounting the appliance, only the holes actually required should be
punched out. Any other holes that are not going to be used must be
sealed watertight.
Inserting the connecting cable (Fig. D)
• Push the grommet
11
over the end of the connecting cable.
Note:
Do not use the grommet for a cable with a cross-section
of 16 mm
2
. The appliance must then be installed flush with the wall.
WARNING:
Attention:
Without a grommet, the TR1000 12 B is splashproof only (IP 24).
• Place the heater over the connecting cable.
• Press the grommet into the hole in the rear wall of the heater through
which the cable should be fed. Ensure that the edges of the grommet
are flush with the hole all the way round.
• Fit the heater onto the threaded bushing
8
and secure it in place with
the nut
9
.
Compensating for unevenness in the wall (Fig. E)
III. Water connection
• Using the locking screw
15
, the water connection can be aligned
by ± 10 mm vertically.
• Adapt the bend in the
“hot”
pipe so that it lines up with the hot-water
outlet.
In doing so, make sure that the “cold” elbow connection
is not bent.
CAUTION:
Attention:
Ensure that a distance of at least 6 mm is maintained to live parts
of the heater.
• Connect the water outlet and inlet and tighten the securing nut on
the mounting bolt.
Checking for leaks and flushing the heater:
• Turn on the hot-water tap.
• Check that all pipe joints are properly sealed.
IV. Electrical connection
• As a matter of principle, the water connections must be completed
first of all before the heater is connected to the electricity supply.
The appliance should be wired up according to the circuit diagram
on the inside of the cover.
• Circuit as delivered:
12 kW Y 400 V 3 ~ (11 kW Y 380 V 3 ~)
Содержание TR1000 12 B
Страница 29: ...1 ...
Страница 30: ...2 ...
Страница 31: ...3 ...
Страница 32: ...4 ...
Страница 33: ...5 ...
Страница 34: ...6 7 ...
Страница 35: ......
Страница 36: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www bosch thermotechnology com ...