1 About this documentation
Editions of this documentation
Edition Release
Date
Note
01
2019-07 First edition
Tab. 1-1: Change Record
1.1 Overview on target groups and product phases
In the following illustration, the framed activities, product phases and target
groups refer to the present documentation.
Example: In the product phase "Mounting (assembly/installation)", the
"mechanic/electrician" can execute the activity "install" using this
documentation.
Presales Aftersales
Selection
Mounting
(assembly/installation)
Engineering
Commissioning
Operation
Decommissioning
Product
phases
Target
groups
Activities
Design engineer
Programmer
Technologist
Process
specialist
Select
Prepare
Design
Construct
Mechanic/
electrician
Unpack
Mount
Install
Programmer
Commissioning engineer
Parameterize
Program
Configure
Simulate
Technologist
Process specialist
Optimize
Test
Machine
operator
Maintenance
technician
Service
Operate
Maintain
Remove
faults
Create
the NC program
Mechanic/
electrician
Disposal company
Dismount
Dispose
Fig. 1-1: Assigning the present documentation to the target groups, product phases and ac-
tivities of the target group
1.2 Purpose
This document instructs the technical staff of the machine manufacturer on how
to perform the mechanical and electrical installation safely and on how to
commission the device.
PR30 and VR30 Control Cabinet PC and
Panel PC
1/45
About this documentation
R911384706_Edition 01 Bosch Rexroth AG