14.2
Planning
Checklist to plan and use the module
Device type, equipment ID
Version: HW/FW
Date
Editor
Tester
Notes
No. Request (mandatory)
Yes
Notes
1
Was the current user manual used for planning? □
Revision:
2
Is it permitted to connect these actuators to the
module (according to the technical data and the
parameterization options)?
□
3
Was the power supply planned acc. to the spec‐
ifications on the protective extra-low voltage as
PELV?
□
4
Was the voltage supply from U
O
and U
BK
plan‐
ned from a power supply unit?
□
5
Is the external protection of the module planned
(acc. to the specifications in the present manual
on the supply voltage U
O
)?
□
6
Were actions planned against simple manipula‐
tion?
□
7
Were actions planned against interchanging the
plugs?
□
8
Are the requirements on the actuators and on
the cable routing observed acc. to the SIL/SIL
CL/cat./PL to be reached and is the implemen‐
tation planned?
□
9
Are the specifications on the parameterization
determined for each channel?
□
10
Are there any test intervals specified to test the
switch-off capability of the actuators if required
to meet an SIL/SIL CL/cat./PL?
□
11
Is it ensured that a purposeful start of hazard‐
ous motions is only possible when the danger
zone can be seen?
□
12
Does the planned use match the intended use? □
13
Are the ambient conditions as well as the me‐
chanical load met as specified in the technical
data?
□
14
Are check intervals determined and was the
maximum service life considered?
□
15
Was the switch-off delay for stop category 1
considered when calculating the total response
time of the machine or system?
□
Bosch Rexroth AG
DOK-CONTRL-S20*SSDO*8*-AP02-EN-P
70/85
IndraControl S20 Module With Safe Digital Outputs S20-SSDO-8/3
Checklists