
Installation 31/68
RE 92004-01-B/05.2017, A4VG Series 40,
Bosch Rexroth AG
7.3 Installation position
The following installation positions are permissible. The pipeline routing shown
illustrates the basic layout.
If filling the stroking chambers via
X
1
to
X
4
is not possible in the final installation
position, then
the filling
must be effected before installation, e.g. in installation
position
2
.
To prevent unexpected actuation and damage, the stroking chambers must be air
bled via the ports
X
1
,
X
2
, or
X
3
,
X
4
depending on the installation position.
For installation position
4
and
10
(drive shaft upwards), you need the additional
air bleed port
R
1
in the flange area. This port is not provided in the standard
v
ersion and must be stated in plain text when ordering.