![Bosch Rexroth 40 Series Скачать руководство пользователя страница 43](http://html.mh-extra.com/html/bosch/rexroth-40-series/rexroth-40-series_operating-instructions-manual_44790043.webp)
Commissioning
43/64
RE 79039-01-B/01.2021, MOBILEX GFB 8000 series 40 general operating instructions,
Bosch Rexroth AG
8.1.6
Completing commissioning and run-in period
NOTE
Property damage caused by low viscosity!
Due to high temperature of the hydraulic fluid/lubricating oil, the viscosity may
fall to low values and cause damage to the product!
Monitor the operating temperature during run-in period, e.g. by measuring the
leakage fluid temperature (axial-piston motor).
Reduce the load (pressure, speed) of the planetary gearbox axial-piston motor
if inadmissible operating temperatures and/or viscosity occur.
Too high operating temperatures indicate faults that have to be analyzed and
eliminated.
Check after approx. 10 hours of full load operation that all mounting screws are
tightly secured. Proceed as described in chapter 10.2.4 “Checking and
retightening screw connections”.
For this, put the planetary gearbox out of service. Proceed as described in the
instructions of the machine or the overall vehicle.
After reaching the operating temperature, check that the planetary gearbox
does not show any leakage. The maximum operating temperature is 90 °C. This
test can be performed during operation. Proceed as described in chapter
10.2.1 “Visual inspections”.
8.2
Recommissioning after standstill
Depending on the assembly and ambient conditions, certain changes in the
hydraulic system can make recommissioning necessary.
The following criteria may make recommissioning necessary:
•
Air and/or water in the hydraulic system
•
Aged hydraulic fluid
•
Other contaminations
Proceed for recommissioning as described in chapter 8.1 “Initial
commissioning”.