background image

PHANTOM

EDGE

Discover the World of IoT

Содержание PHANTOM EDGE

Страница 1: ...PHANTOM EDGE Discover the World of IoT ...

Страница 2: ...ontents List of components Phantom Edge overview Installation steps Technical specification Safety instructions Uninstallation and End of Life disposal instructions 3 4 5 12 13 13 1 2 3 4 5 6 Content Pg No Sl No ...

Страница 3: ...r CT with Connector set of 3 5 CT Cable Extender Optional 1 6 Voltage Connection Cable with Connector 1 7 Cable Ties 4 8 Mounting Screws 4 9 Contact and Warranty Card 1 10 Drill Paper Guide 1 1 6 2 7 3 4 8 5 10 9 Asset Name No Asset Location Facility Contact Phone Number www boschphantom com PHANTOM EDGE 03 PHANTOM EDGE ...

Страница 4: ...E Antenna 1 Micro Sim Slot 2 2 Right View 2 3 Left View 2 4 Back View MICRO SIM LTE Antenna 2 Wi Fi Antenna DOUBLE INSULATION ELECTRICAL HAZARD DO NOT OPEN AUTHORISED PERSONNEL ONLY CAUTION Technical Specifications Manufacturer Details Label Hardware ID VOLTAGE INPUT CT INPUT LTE 1 LTE 2 Wi Fi 00001 RBSGS18121RI1V1R 04 ...

Страница 5: ... flap on its right side to reveal the Micro SIM card slot MICRO SIM MICRO SIM Close the Micro SIM cap and fasten firmly Insert Micro SIM into Phantom Edge as per the marking sticker MICRO SIM LTE 1 LTE 1 LTE 1 c 05 If Wi Fi connection is not available use SIM card for it ...

Страница 6: ...irection using stickers Peel off the cover layer from the backside of Phantom Edge Mount the device in a horizontal direction by using adhesive surface of the stickers Use the Drill Paper Guide and mark the four locations to drill on the target wall Mount the Phantom Edge on the wall using the four screws provided in the kit Drill holes of sufficient depth to accommodate M4 screw provided in the i...

Страница 7: ... in a clockwise direction until it is firm Ensure not to overtighten Insert LTE antenna 2 into LTE antenna 2 port and rotate the antenna nut in a clockwise direction until it is firm Ensure not to overtighten Insert Wi Fi antenna into Wi Fi antenna port and rotate antenna nut in a clockwise direction until it is firm Ensure not to overtighten 07 W i Fi ...

Страница 8: ...ine 3 Voltage Connection VOLTAGE INPUT CT INPUT VOLTAGE INPUT CT INPUT a Connect the CT female connector to the male connector on Phantom Edge which is labelled as Current Input Identify the MCB switch associated with relevant electrical load machine Remove approx 50mm of insulation from wires Connect the four individual wire strands in the voltage connector cable to the appropriate points of the ...

Страница 9: ...MMM SLM7Bxx male connector connected to machine PLC Connect machine s RJ45 ethernet male connector to the RJ45 female port of Phantom Edge and rotate connector nut in a clockwise direction to tighten it Connect machine PLC RS232 female connector to the male connector of Phantom Edge and tighten the screws 09 Use this option only If need to collect the data from a device using RS232 port Use this o...

Страница 10: ...local technician and tag it on the voltage cable Ensure all details are correctly filled for emergency response 3 8 Tidy Up Tidy Up Voltage Connection RS232 Connection Ethernet Connection Tidy Up Voltage Connection RS232 Connection Ethernet Connection 10 a b PHANTOM EDGE PHANTOM EDGE ...

Страница 11: ...ents in the kit Red Yellow Blue Europe UK Blue Brown Black Grey UK Old Black Red Yellow Blue Australia Black Red White Blue USA White Black Red Blue Singapore Blue Brown Black Grey Exhibit 1 Connection Diagram 4 Pole MCB CT Connection Voltage Connection Load Source 11 PHANTOM EDGE RS232 Connection Ethernet Connection ...

Страница 12: ...Surface Mountable Device 0 876 Kg 220 8mm X 156 7mm X 62 5mm L B H Arm Cortex A53 MP Core Platform 2GB 8GB eMMC Linux Kernel Class 1 CAT III Voltage 90 to 280 VAC L N Current Upto 1000A Input Supply AC only Energy Consumption 10W Frequency 50 60Hz 2 Hz Upto 7 days of data backup in case of connectivity loss Technical Specification 1 2 12 Arm Cortex A53 cores i MX 8M Mini Dual lite 1 6GHz Base Oper...

Страница 13: ...le Regulatory Compliance EMC Standards RF Standards Safety Construction USA EU Canada 802 11 b g n 2 4GHz 20 40MHz GSM frequency 850 900 1800 1900MHz B1 B2 B3 B4 B7 B8 B12 Bands BLE 5 RJ 45 10 100Mbps RS232 Protocol Max Baud Rate 115Kbps 10 C to 50 C 10 to 95 Below 2000m Class II Double Insulation IP64 2 100A 200A 400A 1000A Available 4C 0 5 sq mm wire EN 301 489 1 IEC 61326 1 2013 EN 300 328 EN 3...

Страница 14: ...ergized by using a tester When an electric tester touches a live or hot wire the bulb inside the tester lights up showing that the respective wire is live Check all the wires the outer metallic covering of the LT panel and any other hanging wires with an electrical tester before proceeding with your work 5 Be sure your hands are dry and wear non conductive gloves protective clothing and shoes with...

Страница 15: ...ns ii Remove cable ties used to tie up loose wires iii Remove ethernet connections Optional iv Remove RS232 connections Optional v Remove CT connections Optional vi Remove antennas from the device vii Remove the SIM from device 5 Customer is responsible for proper disposal of the device at its end of life Bosch as a component manufacturer shall adhere to meet regional and local requirements in the...

Страница 16: ...olutions PVT LTD India Europe USA Japan UK Middle East China Vietnam Mexico Support Phantom in bosch com Robert Bosch Engineering and Business Solutions Private Limited RBEI All rights reserved also regarding any disposal exploitation reproduction editing distribution as well as in event of the applications for industrial property rights ...

Отзывы: