26
en | Mounting /Installation
Radio gateway
2019.10 | 2.0 | F.01U.373.488
Operation Manual
Bosch Sicherheitssysteme GmbH
5
Mounting /Installation
4
5a
5b
1
3
3
2
6
1
Housing cover
2
Screw (Torx T7)
3
Lock
4
Strain relief fastenings
5
Cable entries
6
Back box
Mounting the radio gateway
▷
Radio gateway, battery pack, fixing screws, and cable tie are at hand.
▷
You have the device location plan at hand.
▷
The connection cable has a conductor cross-section of 0.2…1.5 mm².
▷
The lines to the installation location are installed.
▷
Two fixing screws (Ø max. 3.6 mm) are at hand.
1.
Determine the installation location:
- The housing must be positioned in accordance with the planning specifications (make
sure there is a wide radio range and that the housing can be accessed easily).
- Make sure there is enough space for you to open the housing cover easily.
- The housing may be installed in any appropriate position.
2.
Take the adhesive label bearing the serial number from the accessory bag and use it to
mark the installation location on the device location plan.
3.
In the back box (6), break out the plastic for the cable entry:
- Openings in the supporting surface for flush-mounted cables (5a)
- Openings in the narrow side for surface-mounted cables (5b)
4.
Insert the cables into the back box (6).
Содержание FWI-270
Страница 1: ...Radio gateway FWI 270 en Operation Manual ...
Страница 2: ......
Страница 52: ...52 Specifications Radio gateway 2019 10 2 0 F 01U 373 488 Operation Manual Bosch Sicherheitssysteme GmbH ...
Страница 53: ......