en
Installation
14
5
Installation
Installation
Preparing the installation
Caution!
Ensure that there are no electrical wires, gas pipes or
water pipes in the area where holes are to be drilled.
1.
Mark a vertical centre line on the wall from the
ceiling to the lower edge of the extractor hood.
2.
Use the enclosed template to mark the positions for
the screws and the outline of the attachment area.
3.
Drill five 8 mm diameter holes to a depth of 80 mm
for fastening the appliance and press in the wall
plugs flush with the wall.
Installation
1.
Screw on the fixing bracket for the flue duct.
¨
2.
Screw on brackets for the extractor hood hand-tight.
Do not firmly tighten the screws.
©
3.
Screw in the threaded bolt, leaving it protruding out
of the wall by
5–9 mm
.
ª
[
PP
PP
PP
PP
PP
[
$
[
%
NJONN
NBYNN
&
Содержание DWB67CM50
Страница 2: ......