128
Operation
6.21.1
Screwing in the quickly adjustable stem
Only applies to
ebikes
with this equipment
Screw in the All Up stem to save space when
parking.
1
Open stem clamping lever.
Figure 129: Example of All Up with open stem clamping
lever
2
Pull handlebars into highest possible position.
Figure 130: Example of All Up pulled into highest possible
position
3
Turn handlebars 90° in a clockwise direction.
Figure 131: Example of All Up screwed in
4
Place handlebars at required height.
5
Close stem clamping lever.
Содержание BULLS 650-185
Страница 211: ...210 Notes ...
Страница 213: ...212 About these operating instructions ...
Страница 215: ...214 About these operating instructions ...
Страница 217: ...216 About these operating instructions ...
Страница 219: ...218 About these operating instructions ...
Страница 220: ...219 About these operating instructions ...
Страница 221: ...220 About these operating instructions ...
Страница 222: ...221 About these operating instructions ...
Страница 223: ...222 About these operating instructions ...
Страница 224: ...223 Documents 11 4 Charger operating instructions ABCDE ...
Страница 225: ...224 Documents F 4A Charger DCG F H A I A J ...
Страница 226: ...225 Documents F A I A J DCG F H ...
Страница 227: ...226 Documents F DCG F H A I A J ...