10.4.18 Changing the conveyor chain: BS 2/C-100, BS 2/R-300,
motor mounting (MA) = M
Fig. 47:
563 833-49
2
8
3
3
1
2
9
4
7
4
6
5
1
8 981 010 511
8 981 010 510
3
)
3
)
M
D
= 2,5 Nm
SW4
M
D
= 2,5 Nm
SW4
Changing the conveyor chain BS 2/C-100, BS 2/R-300, MA = M (1/3)
Please note:
Perform the steps on both
sides in parallel.
Disassembling the chain:
1.
Disassemble the outer
protective case halves.
2.
Fix the chain tensioner
.
3.
Open the chain with the
disassembly tool
3
).
3
) Disassembly tool:
– for fl at top chain:
3 842 010 510
– for accumulation roller
chain:
3 842 010 511
4.
Remove the drive and
return head covers.
5.
Pull the chain back
until the drive head
is exposed.
6.
Remove the sliding piece.
7.
Remove the drive train.
8.
Pull the used chain
down from the BS 2....
9.
Remove the sliding
piece from the
return head.
64/84
Maintenance and repair
Bosch Rexroth AG
, MIT: BS 2/C-…, BS 2/R-…, 3 842 563 834/2022-08