![Bosch AVENAR panel Скачать руководство пользователя страница 48](http://html.mh-extra.com/html/bosch/avenar-panel/avenar-panel_system-manual_44768048.webp)
48
en | Installation
AVENAR panel
2022-07 | 5.0 | F.01U.378.910
System manual
Bosch Sicherheitssysteme GmbH
4.4
Installation of HCP 0006 A, fully assembled panel
The installation sequence is given by the numbers 1 to 10.
UPS 2416 A
PRS-0002-C
HCP 0006 A
<= 4 Module
FPO-5000-PSB-CH
12 V / 28 Ah
12 V / 28 Ah
BCM-0000-B
PRD 0004 A
4
8
2
3
9
1
7
5
6
Figure 4.2:
Installation of HCP 0006 A, fully configured panel
4.5
Extended line monitoring (VdS 2540, VdS 2543)
Auxiliary power supplies to the following modules can be monitored for creeping short circuits
and creeping open: LSN 0300 A, LSN 1500 A, and BCM-0000-B (when using FPP-5000-TI13). A
creeping short circuit is detected by these modules. An FPP-5000-TI13 forwards the faults
detected and reported by the BCM-0000-B to the panel. Use additional 4-wire end of line
elements to monitor for creeping open.
Procedure:
Содержание AVENAR panel
Страница 1: ...AVENAR panel en System manual ...
Страница 2: ......
Страница 73: ...AVENAR panel Index 73 Bosch Sicherheitssysteme GmbH System manual 2022 07 5 0 F 01U 378 910 ...
Страница 74: ...74 Index AVENAR panel 2022 07 5 0 F 01U 378 910 System manual Bosch Sicherheitssysteme GmbH ...
Страница 75: ......