18
|
Commissioning, inspection and maintenance reports
AGS10-2, AGS10E-2, AGS20-2, AGS50-2
6 720 811 270 (2015/04)
8
Commissioning, inspection and
maintenance reports
We recommend conducting the first inspection or maintenance after
approx. 500 hours.
▶ Test (inspect) solar systems at least once every
2 years
. Immediately
remedy all faults (maintenance).
▶ Perform activities and fill out log.
DANGER:
Risk to life by falling from roof!
▶ Whilst working on the roof, take all necessary
precautions against a possible fall.
▶ If there are no general anti-fall safety devices
available, wear personal protective equipment.
DANGER:
Danger to life through electric shock!
▶ Before carrying out work on electrical components,
isolate them from the power supply (230 V AC) (fuse,
circuit breaker) and secure against unintentional
reconnection.
Commissioning, inspection and maintenance may only
be carried out by authorised contractors.
Follow the instructions for the components.
Содержание AGS10-2
Страница 20: ...20 Commissioning inspection and maintenance reports AGS10 2 AGS10E 2 AGS20 2 AGS50 2 6 720 811 270 2015 04 ...
Страница 25: ... 25 6 720 811 270 2015 04 AGS10 2 AGS10E 2 AGS20 2 AGS50 2 Notes ...
Страница 26: ...26 AGS10 2 AGS10E 2 AGS20 2 AGS50 2 6 720 811 270 2015 04 Notes ...
Страница 27: ... 27 6 720 811 270 2015 04 AGS10 2 AGS10E 2 AGS20 2 AGS50 2 Notes ...
Страница 28: ......