F 002 DG9 432
2014-12-19
|
Bosch Limited
16 | ACS 255 | Program description
en
The default values of the parameters in each stage are
listed in the following table:
Service phase
Parameter
Default value
Recovery
Pressure increase time
1 min
Vacuum
Vacuum time
20 min
Vacuum hold time
4 min
Oil recharge
Refrigerant quantity
500 g
10 ml
Oil quantity
Tab. 1:
Default values of parameters
6.6.2
Recovery
In the recovery phase, the following parameters can be
set:
R
Duration for the pressure increase test
R
Hose selection
$
HP hose
$
LP hose
$
HP and LP hoses
6.6.3
Vacuuming phase
In the vacuuming phase, the following parameters can
be set:
R
Vacuum creation time
R
Vacuum test time
R
Hose selection
$
HP hose
$
LP hose
$
HP and LP hoses
i
Ensure that you perform recovery before the vacu-
uming.
6.6.4
Oil recharge phase
In the oil recharge phase, the following parameters can
be set:
R
Oil quantity
R
Refrigerant quantity
R
Hose selection
$
HP hose
$
LP hose
$
HP and LP hoses
i
Oil injection can only be carried out on an A/C sys-
tem that is under vacuum.
i
Every time oil is recharged, R134a is also recharged.
i
The quantity of oil added to the vehicle A/C system
corresponds to the quantity drawn during the recov-
ery phase. When filling a vehicle A/C system for the
first time, refer to the vehicle documentation or the
vehicle-specific repair manual for the specified oil
recharge quantity.
i
Use oil grade specified by the vehicle manufacturer.
Use only new oil to replace the oil removed during
the recovery process. Used oil should be discarded
as per local regulations.
6.6.5
Recharge phase
In the recharge phase, the following parameters can be
set:
R
Refrigerant quantity
R
Hose selection
$
HP hose
$
LP hose
$
HP and LP hoses
6.7
Performing service in manual mode
!
Use only new oil to replace the amount removed dur-
ing the recovery process. Used oil should be discard-
ed as per applicable regulations.
1.
In the main menu, select "
Vehicle
A/C Services
" >>
"
Manual Mode
". Alternatively, press .
The phases that can be executed in the manual
mode are displayed on the screen.
2.
Press the
o
or
u
keys to scroll to a particular phase.
To select a particular phase or multiple phases for
execution, press
.
i
Refer to the vehicle-specific documentation for the
A/C service parameters.
!
Always pay attention to the vehicle-specific info be-
fore changing the quantity of oil and R134a.
3.
Press
and then
E
.
The service parameters for the selected phases
are displayed.
4.
Set the values of the service parameters.
5.
Check the type of connection on the vehicle
A/C system.
!
Do not use any tools to tighten the couplers.
6.
Connect the appropriate coupler/s to the service
connection on the vehicle A/C system.
7.
Press
E
.
The selected service phase starts. At the end of
the service,
Hose Drain
menu is displayed.
8.
Turn the HP/LP quick couplers in the counterclock-
wise direction and disconnect from the service con-
nections on the vehicle A/C system.
9.
Press
E
.
10.
Press
E
to start draining the refrigerant from the
hoses.
Once the refrigerant is drained, a summary
screen is displayed.
"
The servicing of the vehicle A/C system is complete.
Содержание ACS 255
Страница 1: ...ACS 255 en Original instructions A C service unit ...
Страница 2: ......
Страница 22: ......
Страница 23: ......