37
Preparing the counter section:
Top mounting of the built-in units:
The counter should be cut as accurately as possible
using a good, straight saw blade or a router.
The sections should then be sealed so that no
moisture enters.
The hob section is prepared in accordance with the
illustrations. The hob extractor must be flat and level
so as to prevent a distortion and the resulting damage.
As the BORA-Classic built-in units can be combined
as desired, the following sectional dimensions are
available depending on the installation situation:
Maintain a 2 mm distance between all the built-in units.
Mounting instructions
GB
Surface-mounting