![Bomag BW 100 AD-5 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/bomag/bw-100-ad-5/bw-100-ad-5_operating-and-maintenance-instructions_2785490042.webp)
3.6
Start-up procedure
3.6.1
Prior to starting up
Use only machines which are serviced at reg-
ular intervals.
Become acquainted with the equipment, the
indicators and control elements, the working
principle of the machine and the working area.
Use your personal protective equipment (hard
hat, safety boots, if necessary also goggles
and ear protection).
Do not take any loose objects with you or
fasten them to the machine.
Before mounting the machine check whether:
n
persons or obstructions are beside or under
the machine,
n
the machine is free of oily and combustible
materials,
n
all access steps, grips and platforms are free
of obstacles, grease, oils, fuel, dirt, snow
and ice,
n
all safety elements are in place,
n
all maintenance flaps and doors are closed
and locked.
Use only the intended access steps and grips
to mount the machine.
Before start up, carry out all required visual
inspections and function tests.
If the following tests reveal damages or other
faults, the machine must not be operated, until
these deficiencies have been corrected.
Do not operate the machine with defective indi-
cators and control elements.
Concerning your safety – Start-up procedure
BW 100 AD-5
42
Содержание BW 100 AD-5
Страница 2: ...2 ...
Страница 9: ...1 Introduction Introduction BW 100 AD 5 9 ...
Страница 13: ...2 Technical data Technical data BW 100 AD 5 13 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 100 AD 5 19 ...
Страница 64: ...Concerning your safety Signage BW 100 AD 5 64 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 100 AD 5 65 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 100 AD 5 81 ...
Страница 96: ...Checks prior to start up Checking the hydraulic oil filter BW 100 AD 5 96 ...
Страница 97: ...6 Operation Operation BW 100 AD 5 97 ...
Страница 122: ...1 Plug Y04 Operation Emergency procedures BW 100 AD 5 122 ...
Страница 123: ...7 Loading transporting the machine Loading transporting the machine BW 100 AD 5 123 ...
Страница 134: ...Loading transporting the machine After transport BW 100 AD 5 134 ...
Страница 135: ...8 Maintenance Maintenance BW 100 AD 5 135 ...
Страница 188: ...Maintenance As required BW 100 AD 5 188 ...
Страница 189: ...9 Setting up refitting Setting up refitting BW 100 AD 5 189 ...
Страница 197: ...10 Troubleshooting Troubleshooting BW 100 AD 5 197 ...
Страница 208: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 AD 5 208 ...
Страница 209: ...11 Disposal Disposal BW 100 AD 5 209 ...
Страница 211: ......