![Bomag BW 100 AD-5 Скачать руководство пользователя страница 154](http://html1.mh-extra.com/html/bomag/bw-100-ad-5/bw-100-ad-5_operating-and-maintenance-instructions_2785490154.webp)
3.
Check the entire circumference of the V-
belt for damage and cracks.
4.
Replace a damaged or cracked V-belt
Chapter 8.9.2 „Replacing the V-
5.
Check with thumb pressure whether the V-
belt can be depressed more than
7 to 9 mm (0.28 – 0.35 inch) between the
V-belt pulleys, retighten if necessary.
8.8.2.2
Tightening the V-belt
Protective equip-
ment:
n
Working clothes
n
Protective gloves
1.
Loosen the tensioning screw (1) and the
screw (2) on the generator.
2.
Press the generator towards the outside
using a lever, until the correct V-belt ten-
sion is reached.
3.
Retighten clamping screw (1) and screw
(2).
8.8.3
Check the air intake lines
Protective equip-
ment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
Chapter 6.7 „Parking the machine in
secured condition“ on page 113
.
2.
Allow the engine to cool down.
3.
Check the condition and tight fit of all air
intake lines and hose clamps.
4.
If fuel lines or hose clamps are found to be
damaged, the corresponding parts must be
immediately replaced.
Fig. 123
Fig. 124
Maintenance – Every 250 operating hours
BW 100 AD-5
154
Содержание BW 100 AD-5
Страница 2: ...2 ...
Страница 9: ...1 Introduction Introduction BW 100 AD 5 9 ...
Страница 13: ...2 Technical data Technical data BW 100 AD 5 13 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 100 AD 5 19 ...
Страница 64: ...Concerning your safety Signage BW 100 AD 5 64 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 100 AD 5 65 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 100 AD 5 81 ...
Страница 96: ...Checks prior to start up Checking the hydraulic oil filter BW 100 AD 5 96 ...
Страница 97: ...6 Operation Operation BW 100 AD 5 97 ...
Страница 122: ...1 Plug Y04 Operation Emergency procedures BW 100 AD 5 122 ...
Страница 123: ...7 Loading transporting the machine Loading transporting the machine BW 100 AD 5 123 ...
Страница 134: ...Loading transporting the machine After transport BW 100 AD 5 134 ...
Страница 135: ...8 Maintenance Maintenance BW 100 AD 5 135 ...
Страница 188: ...Maintenance As required BW 100 AD 5 188 ...
Страница 189: ...9 Setting up refitting Setting up refitting BW 100 AD 5 189 ...
Страница 197: ...10 Troubleshooting Troubleshooting BW 100 AD 5 197 ...
Страница 208: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 AD 5 208 ...
Страница 209: ...11 Disposal Disposal BW 100 AD 5 209 ...
Страница 211: ......