234100: 115VAC, 175W, 1.6A  

234100-2: 230VAC, 175W, 0.8A 

 
 
 
 
 

OPERATING INSTRUCTIONS 

 
 
 
 
 

Содержание 234100

Страница 1: ...N2400340 Rev 2 Page 1 BOEKEL UV CROSSLINKER Model 234100 115VAC 175W 1 6A 234100 2 230VAC 175W 0 8A OPERATING INSTRUCTIONS...

Страница 2: ...Identification of Controls 5 5 0 Installation 7 6 0 Operation 7 7 0 Technical Specifications 9 8 0 Maintenance and Service 9 8 1 Calibration 9 8 2 Changing Bulbs 10 8 3 Cleaning 11 8 4 Contrast Adjust...

Страница 3: ...traviolets Prot ger les yeux et la peau des rayons ultraviolets nocifs Always observe the following safety precautions Avoid exposure to direct or strongly reflected germicidal ultraviolet rays Germic...

Страница 4: ...h all applicable disposal laws Do not position the equipment in a manner that makes it difficult to disconnect the power cord from the receptacle on the back of the unit Protection provided by the equ...

Страница 5: ...he unit when changing bulbs 3 0 Assembly Remove the packing materials carefully and retain for future shipment or storage of the unit Inspect for damage Report all shipping damage to the carrier immed...

Страница 6: ...N2400340 Rev 2 Page 6 Figure 1 Front View Figure 2 Back View 1 LCD DISPLAY 2 POWER KEY 3 MODE KEY 4 RESET KEY 5 START STOP KEY 6 UP DOWN ARROW KEYS 7 AC POWER SOCKET 8 HEIGHT ADJUSTMENT KNOB...

Страница 7: ...gy Mode is selected The Up and Down keys are used with a speedup algorithm to set the desired target energy value If the Mode key is pressed the colon for time blinks showing that Time Mode is selecte...

Страница 8: ...ws the following for 1 second The user is returned to the main screen in paused mode where they can adjust the target energy or time CYCLE PAUSED blinks every 2 seconds to remind the user that the cyc...

Страница 9: ...he requirements of CAN CSA C22 2 No 61010 1 second edition including Amendment 1 or a later version of the same standard incorporating the same level of testing requirements 8 0 Maintenance and Servic...

Страница 10: ...cement of pins in sockets at both ends of each bulb that is installed 8 2 2 To use a different wavelength the entire set of 5 bulbs must be replaced with a set of 5 bulbs of the desired wavelength See...

Страница 11: ...agents other than mild soap and water on the viewing window as damage to the window may result 8 4 Contrast Adjustment 8 4 1 To increase or decrease the contrast level of the display power the unit on...

Страница 12: ...t bulbs are operational and replace blown bulbs as needed Duration of Energy Mode significantly longer than usual for given amount of energy a Blown bulb s a Ensure all light bulbs are operational and...

Страница 13: ...rtificate must be completed signed by the user and returned to Boekel Scientific in order to receive the RMA number Please be sure to mark the outside of the returned goods package with the RMA number...