
User manual for BCL-B series laser machine
Jinan Bodor CNC Machine Co.,Ltd
www.bodorcnc.com
17
2.2.1.7 Equipment Socket
III
Machine Installation
3.1 Before Installation
3.1.1 Preparation of area
Make sure the area is dry enough. And any electromagnetism, strong power, pollution is
air switch
main power
supply
fuse
socket to plug: water chiller,
air compressor, exhaust fan
ground
electrode
interface
water chiller
signal line
water inlet
air inlet nozzle
water outlet