Installation, assembly and commissioning
for the first time
Version 1.1
Page 84 of 113
Important:
To ensure that all slave batteries are activated from the master battery in case of a different voltage level
for different batteries, change the charge status of the master battery by charging and discharging using the
inverter.
Within a full cycle (i.e. the battery is completely charged once and completely discharged once), the master
battery scans all slave batteries in the stand-by mode and switches them off one by one.
This process may take a few hours depending on the available PV energy or loads in the company network.
4.14.4
Example 1:
6 batteries connected in parallel with different charge statuses:
-
The master battery is switched on and the main relay is switched on
-
2 slave batteries are switched on and the main relay is switched on
-
3 slave batteries are switched on and the main relay is
NOT
switched on
Figure 4-34: representation of example 1, different SOC of BMZ ESS batteries connected in parallel
4.14.5
Example 2:
6 batteries connected in parallel with different charge statuses:
-
The master battery is switched on and the main relay is switched on
-
4 slave batteries are switched on and the main relay is switched on
-
1 slave battery is switched on and the main relay is
NOT
switched on
Содержание ESS 7.0
Страница 1: ...OPERATING MANUAL ESS 7 0 ...
Страница 2: ...Version 1 1 Original operating manual ...
Страница 110: ...Annexe Version 1 1 Page 110 of 113 10 1Declaration of conformity Figure 10 1 EC Declaration of Conformity ...
Страница 111: ...Annexe Version 1 1 Page 111 of 113 10 2Warranty card Figure 10 2 warranty card ...
Страница 112: ...Annexe Version 1 1 Page 112 of 113 10 3Installation check list Figure 10 3 installation check list ...
Страница 113: ...Annexe Version 1 1 Page 113 of 113 Figure 10 4 installation check list part 2 ...