
Cable routing from above/below
1. Route the supply cable through the cable
gland and tighten the gland.
The cable sheath
1
must be visible in the
connection zone.
Cable routing from behind (flush-mounted)
1. The supply line must be routed through the
bushing/double membrane seal
1
as shown.
IMPORTANT
Make sure that the double membrane
seal fits neatly against the cable sheath.
Make sure that the supply line
is inserted centrally, straight and
pressure-free through the double
membrane seal and that a tight fit is
guaranteed.
Inserting additional cables
1. Run the required additional cables, such as the bus cable for external electricity meters or
Ethernet, into the connection zone of the Wallbox.
2. Use the supplied double membrane seal M16 to seal the bushing.
EN
29
Содержание MINI Wallbox Essential
Страница 1: ...MINI Wallbox Plus Installation instructions Freude am Fahren ...
Страница 2: ......
Страница 3: ...MINI Wallbox Plus Installation instructions 5 EN ...
Страница 4: ......
Страница 49: ...MISCELLANEOUS Dimensions Dimensions in millimetres EN 49 ...
Страница 56: ...PRODUCT INFORMATION PAGE This telecommunications equipment complies with the NTC requirement 56 ...
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ...Mehr über BMW www bmw de www bmw com Freude am Fahren Doc 108154 Mat 108154 IA MINI Wallbox Plus 1 0 ...