Document #: BPI-PM013-00
13
2. Carefully angle and push assembly through the opening in the ceiling.
Figure 11: Insert the PK-220 Sideways and Upwards into the Ceiling Grid
3. Orient the PK-220 with louver openings facing down and rest the frame on the ledge of the
ceiling grid.
1
8” of space above the ceiling tiles, and 12” of space on two adjacent sides are needed to
maneuver the PK-220 into place
Figure 12: Turn the PK-220 so the Grilles Face Down and the PK-220 Nests into Ceiling
Grid
4. Attach hanger wire to support both the ceiling grid and the PK-220 as defined by
relevant building codes.
Содержание PK-220
Страница 4: ...Document BPI PM013 00 3 Key Components Figure 1 Bluezone PK 220 Key Components ...
Страница 11: ...Document BPI PM013 00 10 Figure 8 PK 220 Floor Mounted Figure 9 PK 220 Wall Mounted ...
Страница 19: ...Document BPI PM013 00 18 Figure 15 Display Sequence in Time ...
Страница 26: ...Document BPI PM013 00 25 Figure 17 Remove Service Cover Figure 18 Remove Bulb Clip Screws ...
Страница 28: ...Document BPI PM013 00 27 Figure 21 Slide Bulb with Bulb Clip into the Bulb Support Bracket ...
Страница 29: ...Document BPI PM013 00 28 Figure 22 Install Bulbs into Sockets Figure 23 Install Service Cover ...