Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2016 Allendale LLC All Rights Reserved
Read Manual Before Use
Refer to detailed instructions in the
AL350G Lift Series Manual at all times
AL350G Lift Series
Quick Reference Sheet
-
Primary Guying
LOWERING / RECOVERY
Raise the mast up enough to
remove the 1st mast pole .
Lock the cam lock and lower
the lift base plate and remove
the 1st mast pole.
Raise the lift base plate until it
nests firmly into the next mast
pole.
Release the cam lock and
SLOWLY
lower the mast to the
ground. Remove the mast pole.
Raise the lift base plate until it
nests firmly into the next mast
pole.
1
2
3
4
5
6
9
8
7
Unlock the ALL guy ropes and
slide the guy handles toward
the guy stakes 12 inches.
Release the cam lock.
Remove the stakes from the Lift
Base Plate by using the stake
remover.
Adjust all 4
PRIMARY
Guy Ropes so the mast is straight and perpen-
dicular. You should only have to adjust the primary guy ropes for the
first 2 - 3 center mast poles, unless you are experiencing high winds.
Repeat this process until the
red primary guy ring is within
reach.
Remove the 4 primary guy
ropes and unpin the primary
guy ring.
Pull the slack in from all primary
guy ropes, wind them up and
stow them.
Remove the tripod leg struts
from the strut base plate and
secure the struts to the legs.
Remove the red tipped strut
base plate stake and stow the
strut base plate.
10
11
12
13
14
Remove red primary guy ring
and stow it with the guy ropes.
Release the ball stop from the
holder and wind up the cable on
the winch.
Loosen the turn knob on the tilt
leg and kneel the tripod.
Remove all equipment from the
mounting pole.
Remove both stakes from the
tripod tilt leg and the left stakes
from the other tripod legs.
15
16
17
18
19