background image

Do Not Duplicate, Alter, or Copy without the Express Written Consent  

of  BlueSky Mast, Inc.  Copyright 2016 Allendale LLC All Rights Reserved   

 

AL350G Lift Series

 

Quick Reference Sheet 

-

 Primary Guying

 

DEPLOYMENT

 

[email protected]

 

Read Manual Before Use 

Refer to detailed instructions in the 

AL350G Lift Series Manual at all times 

01

/1

 

 

Guy  Stake  #1 

-  At  the  15M 

mark  drive  a  stake  into  the 

ground at an angle. 

Guy  Stake  #2

 - make sure it is 

staked directly opposite and  

inline with guy stake #1. 

 

Loosen  the  turn  knobs  on  the  

 

tripod  struts  and  extend  them 

towards the strut base plate. 

DO  NOT 

loosen the turn knobs 

on the tripod legs. 

 

Confirm  the  cable  is  taut  and 
the lift base plate is secure. 

31

 

29

 

37

 

32

 

34

 

36

 

33

 

21

 

22

 

23

 

24

 

24

 

25

 

26

 

27

 

28

 

One at a time, align the tripod strut to the strut base plate receiver and 
secure with hitch pin. Pull on the strut to adjust it to the right or left.  

DO NOT 

loosen the turn knobs on the tripod leg to adjust the strut. 

Make  sure  the  strut  base  plate 
is centered under the tripod and 

tighten all 3 strut turn knobs. 

Locate the 

RED  TIPPED  strut 

base  plate  stake

 and hammer 

it into the strut base plate. 

Reconfirm  ALL  tripod  legs  and 
tripod  strut  turn  knobs  have 

been tightened. 

Leave  1  inch  of  the  mounting 
pole visible below the cam lock 

and lock the cam lock. 

1”

 

Release  the  cam  lock  on  the 
tripod  and  raise  the  mounting 

pole by turning the winch. 

Pin the 

Red Primary Guy Ring 

to  the  Mounting  Pole  BELOW 

your devices. 

30

 

31

 

Person #1 

Locate the 

GUY LEADER 

with orange guy rope and clip it 

into  the 

Round  Hole 

on  the  primary  guy  ring.  Walk  away  from  the 

mast unwinding the guy leader rope until you reach the 15M mark. 

Deploy Primary Guying 

4 Guy Configuration 

2 ppl.

 

Person  #2 

- Locate the 4 Large 

Guy  Stakes    and  Hammer  and 

follow behind person #1. 

NOTE: 

If you have lost or do not have a GUY LEADER to mark your 

guy stakes. Start at the center of the tripod and take one “NORMAL” 

step per meter of system height. Example: 15M = 15 NORMAL steps. 

Repeat  this  process  until    all  4 
primary  guy  stakes  have  been 

deployed 90 degrees apart. 

35

 

Отзывы: