Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2015 BlueSky Mast, Inc. All Rights Reserved
Read Manual Before Use
Refer to detailed instructions in the
AL2 Lift Series Manual at all times
AL2 Lift Series
Quick Reference Sheet
-
Primary and Secondary Guying
LOWERING / RECOVERY
Raise the mast up enough to
remove the 1st mast pole .
Lock the cam lock and lower
the lift base plate and remove
the 1st mast pole.
Raise the lift base plate until it
nests firmly into the next mast
pole.
Release the cam lock and
SLOWLY
lower the mast to the
ground. Remove the mast pole.
Raise the lift base plate until it
nests firmly into the next mast
pole.
1
2
3
4
5
6
9
8
7
Unlock the ALL guy ropes and
slide the guy handles toward
the guy stakes 12 inches.
Release the cam lock.
Remove the stakes from the Lift
Base Plate by using the stake
remover.
Adjust all 4
PRIMARY
Guy Ropes so the mast is straight and perpen-
dicular. You should only have to adjust the primary guy ropes for the
first 3 - 4 center mast poles, unless you are experiencing high winds.
Repeat this process until the
blue secondary guy ring is
within reach.
WARNING:
If at any point the
mast begins to slip while the
cam lock is locked -
STOP
Use the 7/16 wrench provided
with the system to make adjust-
ments to the cam lock.
Tighten the nut on the cam lock
a quarter turn until slipping no
longer occurs.
Remove the 4 secondary guy
ropes and release the cam lock
on the secondary guy ring.
Continue lowering the mast until
the primary guy ring is within
reach.
Remove the 4 primary guy
ropes and unpin the primary
guy ring.
Pull the slack in from all primary
and secondary guy ropes, wind
them up and stow them.
Remove and stow all guy
stakes.
Remove and stow the primary
and secondary guy rings
10
11
12
13
14
15
16
17
18
19