background image

Do Not Duplicate, Alter, or Copy without the Express Written Consent  

of  BlueSky Mast, Inc.  Copyright 2015 BlueSky Mast, Inc.  All Rights Reserved   

 

AL2 Lift Series

 

Quick Reference Sheet 

-

 Primary and Secondary Guying

 

DEPLOYMENT

 

[email protected]

 

Read Manual Before Use 

Refer to detailed instructions in the 

AL2 Lift Series Manual at all times 

21

 

 

 

 

20

 

 

Raise the mast by turning the 
winch handle clockwise until 4 

inches show under the tripod. 

Slowly release the cam lock and 
allow the first mast pole to rest 

on the lift base plate. 

Lock the cam lock and lower the 
lift base plate to the ground. 

Insert another mast pole. 

Pay out enough cable to go 
through the pulleys and back up 

to the ball  stop holder. 

Locate  the  lift  base  plate  and  
set  it  on  the  ground  below  the 

mast pole in the tripod. 

Locate the ball stop holder on 
the bottom of the tripod  

opposite the winch. 

22

 

26

 

Lock the cam lock and lower the 
lift base plate to the ground. 

Insert another mast pole. 

WARNING:    If  at  any  point  the 
mast  begins  to  slip  while  the 

cam lock is locked - STOP 

Use the 7/16 wrench and tight-
en  the  cam  lock  a  quarter  turn 

until slipping no longer occurs. 

Repeat steps 25 - 28 until you 
have reached 1/2 the total mast  

Height. 

STOP

 at 1/2 the total mast 

height and lock the cam lock on 

the blue secondary guy ring. 

Attach the blue clip of the 1st secondary guy rope to the round hole on the 
secondary guy ring and walk away from the mast while unwinding all of 

the guy rope. Place it on the ground between the 2 primary guy ropes. 

DO NOT  stake the secondary 
guy rope at this time. 

Repeat this process until all secondary guy ropes have been deployed 
at a 45 degree angle from the primary guy ropes. 

DO NOT 

Stake  the 

secondary guy ropes. They will be staked at the end of deployment. 

24

 

23

 

27

 

28

 

29

 

36

 

35

 

30

 

32

 

33

 

34

 

19

 

Pull the pin and guide the ball 
stop into place. Release the pin 

to secure the ball stop. 

Crank the lift base plate up until 
it nest into the bottom of the 

mast pole and the cable is taut. 

Raise the mast pole until  the 
castle cuts on both mast poles 

nest together. 

Slowly release the cam lock and 
raise the mast pole until 4 

inches show below the tripod. 

31

 

25

 

Отзывы: