
7
ASSEMBLY INSTRUCTIONS (Cont.)
7
STEP 4
Installation of bottom horizontal rail. Measure distance between two fence posts and add 1"
(DIAGRAM 4-A). Each side of bottom rail should extend 1/2” into each fence post. Cut bottom
rail to this measurement.
Note: cut equal amounts off each end of rail to ensure balanced
spacing of spindles
.
Do not install top rail yet!
Attach bottom rail to post using two #8 screws
(DIAGRAM 4-B).
Do not cut more than one rail at a time. Distance between pool uprights may vary.
Continue by cutting and installing remaining bottom rails.
DIAGRAM 4-A
DIAGRAM 4-B