Blue Thumb TWISTER Скачать руководство пользователя страница 1

TWISTER FOUNTAIN

ABTWISTMK - INSTALLATION MANUAL

Unpack fountain:

Open the box and remove the stainless steel lid-light assembly. Carefully remove the pump and plumbing from the cylinder. 
Gently remove the cylinder from the basin. 

Layout & mark appropriate basin area:

Locate your fountain near your preferred viewing area where both water and electricity services are accessible. Clear the 
area and prepare to excavate by tracing the Fountain Basin using marking paint. Be certain to avoid underground utilities.

Prep & Excavate area to required size and depth:

Using a shovel dig 90 degrees into the ground, slightly wider and just as deep as the Fountain Basin making sure to remove 
any sharp rocks or roots. Align the Fountain Basin so that the notched lip is located near or towards where power source.

Ensure basin fits and is level:

Using a level, place the basin within the excavated hole ensuring the Fountain Basin remains level side to side.

Back fill around basin:

Once the Fountain Basin is level carefully back fill using excavated soil. If burying the power cord, leave a small trench to 
bury the pump cord 1-2 inches below grade.

Pump plumbing:

Attach discharge assembly to pump. The fountain pump will be located beneath the stainless steel access panel and inside 
the Fountain Basin.  When looking at the basin, with the notched lip farthest away from you, place the pump in the basin so 
that the pipe is centered and closest to the left side.
 

1 OF 3

Отзывы: