46
Blue Coat SG210 Installation Guide
8
Install the jumper onto the exposed header. Ensure that all of the pins are connected (that the jumper is
not offset).
Figure 5-10: Install the Jumper
9
Replace the cover on the SG210 and tighten the cover screws.
Now that the pass-through card has been removed, you can configure software bridging, which, unlike
hardware bridging, allows you to configure failover. Failover is accomplished by creating virtual IP
addresses on each proxy, creating a failover group, and attaching the bridge configuration. One of the
proxies must be designated with a higher priority (a master proxy). Refer to Volume 2: Getting Started in the
Blue Coat ProxySG Configuration and Management Guide for information.
Install the jumper onto this header
Jumper installed
Содержание SG210 series
Страница 1: ...Blue Coat Systems SG210 Series Installation Guide Version SGOS 5 2 x...
Страница 12: ...12 Blue Coat SG210 Installation Guide...
Страница 40: ...40 Blue Coat SG210 Installation Guide...
Страница 48: ...48 Blue Coat SG210 Installation Guide...