10mm / 15mm Cinema
B10-CS-103 / B15-CS-003
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due
care and remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold
pieces in place while you allow glue to dry.
These instructions are for both the 10mm and 15mm versions of this building. The images used are of
the 10mm version.
Remove the sections for the right hand side of
the building from the sprues.
Starting with the bottom centre piece, glue the walls
to the underside of the roof (as shown above). Note
the wall with the hole in it is at the front.
Take the balustrade pieces from the sprue as
shown above. Note two of these (#2 and #3)
have different size lugs at the ends. The smaller
end will sit into the side wall of the building.
Attach the balustrade, starting with piece #1, then
fitting #2 and #3 in place. Then attach the side wall as
shown.
Remove the pieces shown above from the sprue
(NB: The 15mm version has 2 of the one shown
on the right).
Using the lug which extends out from the side wall to
help position them, glue the uprights to the side wall
as shown, ensuring they all align correctly.