UNIT IS SHIPPED THREE PHASE AND IS FIELD CONVERTIBLE TO SINGLE PHASE.

UNIT TO THE NEAREST SURFACE

MINIMUM CLEARANCE REQUIRED FROM

4 1/8

(105)

6 3/4

(171)

(25)

1

1

(25)

FRONT

BOTTOM

SIDE

BACK

CLEARANCES

INSTALLER MUST MEET CONDITIONS OF ACCEPTABILITY

OUTLINED BELOW UPON INSTALLATION:

1. Required installation clearances:

Wooden and Metal Installation: DO NOT install closer than

4 1/8 inches to front wall, 1 inch to back and side walls,

and 6 3/4 inches to surface below the unit. If the control

box is located below the unit. the front clearance may be

1 inch.

2. Unit shall be accessible for servicing from the bottom.

3. If storage is to be used underneath the unit, it is

recommended that a baffle be placed 8 1/2 inches below

the unit to avoid contact with elevated temperatures.

4. For water and waste connections: This appliance is to

be installed to comply with the applicable federal, state or

local plumbing codes.

TO FABRICATE:

1. Lay out cutout dimensions on countertop and front

apron.

2. Lay out and fabricate control panel holes in counter

apron using the control box as a template.

3. Cut out holes. 

TO INSTALL:

IMPORTANT - DO NOT disconnect lead wires from the

Master Control Panel when making installation.

1. Tilt and pass Control Panel and electrical box through

the countertop cutout, then through the apron cutout.

Lower modular section into countertop cutout and position.

RECOMMENDATION: Before final seating of modular section

to countertop, apply a bead of silicone adhesive/sealant

to the underside of gray gasket material supplied on the

mounting flange.

2. From underneath, insert screwdriver into slots in

Wellslock frame and twist ears outward (clockwise) as

required to secure flange tightly to countertop.

3. Mount Control Box to apron cutout as shown in drawing.

PRODUCT DIMENSIONS

CUTOUT DETAILS

ELECTRICAL

WELLS/BLOOMFIELD * VERDI, NV

MOD-200TDM/AF

BUILT-IN FOOD WARMERS

INSTALLATION INSTRUCTIONS

303438-2   REV (-)

4. Mount Control Panel onto electrical box using the

screws supplied.
TO PLUMB:

1. A drain manifold complete with valve is supplied on all

models except MOD100TD. Location of valve handle is at

the discretion of the fabricator (see drawing).

2. Connect 1" drain connection to suitable drain line.

3. Connect 1/4"NPT water supply to Solenoid valve in

Outlet Box. Note: Maximum pressure 120 psi, maximum

temperature 120

°

F. A backflow preventor is incorporated

in the unit, between the water fill solenoid and pan. Local

codes may require an additional vacuum break device.

(Not provided by Wells). Device must be installed in

accordance with local codes and authorities having

jurisdiction.

TO WIRE:

1. Final connection is accomplished by bringing proper

power supply leads (see 'WIRING REQUIREMENTS' label)

through conduit knockout to terminal block supplied within

the Master Control Panel. Check nameplates for voltage

and phase.

NOTE: INSTALLATION MUST MEET LOCAL PLUMBING AND

ELECTRICAL CODES.

INSTALLATION INSTRUCTIONS

PHASE

AMPS

6.9

6.0

11.9

10.3

L3

L2

L1

75

°

C

75

°

C

12 AWG Cu

12 AWG Cu

11.9
13.8

6.9

6.0

3300

2480

208
240

MOD-200TDM/AF

MOD-200TDM/AF

RATING

FIELD WIRING GAUGE

TEMP.

SINGLE

AMPS PER LINE 3 PHASE

WATTS

VOLTS

MODEL

12 AWG Cu

12 AWG Cu

3 PHASE

1 PHASE

SOLENOID

WATER SUPPLY

1/4 NPT

OUTLET BOX

SCREWDRIVER

COUNTERTOP

WELLSLOK

GASKET

WARMER FLANGE

TOP CUTOUT

FRONT PANEL CUTOUT

28 3/4

(730)

22 1/2

(572)

16 7/8

(429)

4 1/8

(105)

5

(127)

3 1/8

(79)

MASTER

CONTROL

PANEL

IMPORTANT:

MOUNT APPLIANCE SO THAT BOTH THE

MASTER CONTROL PANEL AND DRAIN

MANIFOLD ARE LOCATED TO THE FRONT

OF THE FIXTURE.

1/4 INCH

EXTERNAL NPT

WATER LINE

CONNECTION

1 INCH

INTERNAL NPT

MANIFOLD EACH END

29 1/2

(749)

18

(457)

7 3/4
(197)

14

(356)

1 3/4

(44)

2 1/4

(57)

23 5/8

(600)

6 1/4
(159)

9 3/4
(248)

WITH AUTO WATER FILL

INCHES

(MM)