TABLE OF CONTENTS
Manual Control Operation
from Jan 2007 to Sept 2010
………………
..............
…
4-6
Manual Control Second Level Programming
from Jan 2007 to
…
Sept 201
..........
7
BCX original Manual Control Delime Se
pt 2010 ..................................................
9
Manual Control Operation
from Sept 2010 to Aug 2017 ......................................
10-12
Manual Control Second Level Programming
..............................................
..
.......
13-14
Manual Control Factory Level Programming
...............................................
..
.......
1
5-16
Delime & Flush sequence for BCX14 current Manual &
MenuSelect
.......
.
.......
…
1
7
Menuselect Control Operation……………………………………
..............
…
.
…….
1
9-22
Menuselect Control Second
Level Programming………………
...........
.
....
……….
23-24
SmartTouch Control Opera
tion BX-14 & CNVX-14...............................
………
.
…
2
6-39
SmartTouch Control S
ervice
Level Programming……………
...............
………
.
…
40-42
SmartTouch Control Factory Level Programming…………………
...............
…
.
…
4
3
Notes………………………………………………
.
………
...............
……………
.
.
…...
65
Current manual &
MenuSelect
Relay Board & DC Power Supply…
...............
.
….
66
BCX, BX, and CNVX Probe Chart for all Probes…………
................
…………
.
….
67
Fenwal Intermittent Pilot Ignition Module Operation………………….
.................
..
68-79
Variable Frequency Drive Operation (VFD)
..
……
..................
………
.
……
.
……
...
.
80-85
Hitachi Inverter Error Codes……………………………
.................
……
.
……
.
……..
86-93
BCX14G Hot Air Flow Chart
from Jan 2007 to Sept 2010 ....................................
.
94
BCX14G Steam Flow Chart
from Jan 2007 to Sept 2010
…………………
.
…
........
95
BCX14G Combi Flow Chart
from Jan 2007 to Sept 2010
………...
.....................
...
96
BCX14G Door Switch Troubleshooting
from Jan 2007 to Sept 2010
………
.........
.
97
BCX14G Float
Switch Troubleshooti
ng from Jan 2007 to Sept 2010
…...
.............
.
98
BCX14G Motor Reverse Direction Troubleshooting
from Jan 2007 to Sept 2010
.
..99
BCX14G Drain Valve Operation Troubleshooting
from Jan 2007 to Sept 2010
..
..
.
100
BCX14G Logic Board LED Indicator Designations……
..............................
..
...........10
1
-10
2
Error Codes Manual Control from Jan 2007 to Sept 2010 ..................................
8
Error Codes Manual Control from Sept 2010 to Aug 2017 ........
.
.............
.
..........1
8
Error Codes
MenuSelect
Control ........
.
................
............................
.
...........
.......
2
5
New Manual Control Operation from Aug 2017 to Present ...................................4
4-47
New Manual Control Factory and Service Codes ...............................
..
........
.
......4
8-49
New Smart Touch II Control Operation
................................................................
50-61
New Smart Touch II Contr
ol Factory and Service Codes
....................................
62-64
2
Содержание BCX-14G
Страница 65: ...EŽƚĞƐ 65 ...
Страница 68: ...1 68 ...
Страница 70: ...3 70 ...
Страница 71: ...4 71 ...
Страница 72: ...5 72 ...
Страница 73: ...6 73 ...
Страница 74: ...7 74 ...
Страница 75: ...8 I 75 ...
Страница 76: ...9 y I i w II VA w ti m dul will non 76 ...
Страница 78: ...11 If t r t n 4 th modul 100 nd th pll t r m lnln 78 ...
Страница 84: ...50 0 235 Volts AC 3Ø 2 7 Amps Forward 84 ...
Страница 85: ...50 0 235 Volts AC 3Ø 2 7 Amps Reverse 85 ...
Страница 109: ...EŽƚĞƐ 109 ...
Страница 112: ...112 ...
Страница 113: ...113 ...