background image

Installation Guide

PerfectFIT Venetian Blinds

Assembling the frame

Attach the side frames to the top 

and bottom by inserting the pegs on 

each corner section into their 

corresponding channels in the 

frames. Press the pegs firmly into 

place, the tension in the blind’s 

cords will hold the frame together 

once fully assembled.

Unpack the blind and frame (the side frames are packed separately in the same box), then lay out all the parts to ensure no cords are 

tangled.

Testing the tension

Stand the assembled frame upright and raise it fully to the top. If the blind starts to 

lower slightly of its own accord, the tension will need a small adjustment.

Lay the blind face down and find the small spring at the bottom of the frame, at the 

back. The two ends of the cords are secured to this spring. On one side, the cord is 

secured through a small eyelet with a screw. Loosen the screw, then pull through the 

cord to adjust the tension. Pull the excess cord through by 5-10mm further to 

increase the tension. 

Stand the blind back up and retest, 

making further small adjustments to 

the tension if necessary.

Tighter

Looser

Locate the correct position for the brackets by holding a credit card or store card vertically 

in the corner of the glass - the bracket will sit in line with the edge of the card.

Installing the brackets

Отзывы: