180-CL26.SP.1 v1.00
July 30, 2020
Page 33
CL26.SP.1
INSTALLATION INSTRUCTIONS cont.
ELECTRICAL REQUIREMENTS:
For CL26.SP and Z5177.SP FAN KIT
ELECTRICAL GROUNDING INSTRUCTIONS WHEN Z5177.SP FAN KIT IS INSTALLED
THIS APPLIANCE IS EQUIPPED WITH A THREE PRONG (GROUNDING) PLUG FOR YOUR
PROTECTION AGAINST SHOCK HAZARD AND SHOULD BE PLUGGED DIRECTLY INTO A
PROPERLY GROUNDED THREE PRONG RECEPTACLE . DO NOT CUT OR REMOVE THE
GROUNDING PRONG FROM THIS PLUG.
ELECTRICAL GROUNDING INSTRUCTIONS
LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS. WIRING ERRORS
CAN CAUSE IMPROPER AND DANGEROUS OPERATION.
VERIFY PROPER OPERATION AFTER SERVICING.
WIRING DIAGRAM
on/off switch
145.0725
pilot line
600.0721.A
thermopile
600.0842.VC
thermocouple
Pilot assb
610.0712
600.820.644
SIT Nova valve
CLARITY 26 MILLIVOLT
connect to rear of valve