TECHNICAL MAINTENANCE

The technical maintenance includes periodic cleaning of the grille and solar battery surfaces from accumulated dust and dirt, as well as 
washing the built-in filter as it becomes dirty, but at least once every 6 months.
To clean the unit, wipe its surfaces with a cloth or a brush wetted in a mild soap solution, then wipe the surfaces dry.
Avoid penetration of water inside the electric motor and other electric parts.

POSSIBLE REASONS AND TROUBLESHOOTING

Problem

Possible reasons

Troubleshooting

When switching on the 
ventilator, the fan does not 
start.

No power supply. 

Make sure the power supply line is connected correctly, 
otherwise troubleshoot a connection error.

The motor is jammed, the impeller blades are soiled.

Turn the ventilator off. Troubleshoot the motor jam and 
impeller clogging. Clean the blades. Turn the ventilator 
on.

Low air flow.

The filter or the fan is clogged.

Clean or replace the filter, clean the fan.

The solar battery is dirty.

Clean the solar battery.

Noise, vibration.

The impeller is clogged.

Clean the impeller.

Loose screw connection of the unit casing or the outer 
ventilation hood.

Tighten the screws of the ventilator or the outer 
ventilation hood.

TROUBLESHOOTING

STORAGE AND TRANSPORTATION REGULATIONS

•  Store the unit in the manufacturer’s original packaging box in a dry closed ventilated premise with temperature range 

from +5 °C to + 40 °C and relative humidity up to 70 %.

•  Storage environment must not contain aggressive vapors and chemical mixtures provoking corrosion, insulation, and sealing 

deformation.

•  Use suitable hoist machinery for handling and storage operations to prevent possible damage to the unit.
•  Follow the handling requirements applicable for the particular type of cargo.
•  The unit can be carried in the original packaging by any mode of transport provided proper protection against precipitation and 

mechanical damage. The unit must be transported only in the working position.

•  Avoid sharp blows, scratches, or rough handling during loading and unloading.
•  Prior to the initial power-up after transportation at low temperatures, allow the unit to warm up at operating temperature for at least 

3-4 hours.

Содержание SHM 100 DK

Страница 1: ...Wall ventilator USER S MANUAL EN SHM 100 DK ...

Страница 2: ...e territory of the country SAFETY REQUIREMENTS This unit is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction concerning use of the unit by a person responsible for their safety Children should be supervised to ensure that they do not play with the unit T...

Страница 3: ...the unit and any unauthorized modifications are not allowed Do not expose the unit to adverse atmospheric agents rain sun etc Transported air must not contain any dust or other solid impurities sticky substances or fibrous materials Do not use the unit in a hazardous or explosive environment containing spirits gasoline insecticides etc Do not close or block the intake or extract vents in order to ...

Страница 4: ...1 pc DELIVERY SET PURPOSE The ventilator is designed to ensure continuous mechanical air exchange in flats cottages hotels cafés and other domestic and public premises Designed for in wall installation In sunny weather the ventilator provides ventilation due to the built in fan which is powered by a solar battery In cloudy weather and at night natural ventilation is created due to the difference i...

Страница 5: ...he building Protect the surface of the photocells against possible damage including scratches as this reduces the amount of light that reaches the photocells and therefore the output current The temperature of the transported air should be in the range from 15 С to 40 С The unit is rated as a Class III electrical appliance Ingress protection rating against access to hazardous parts and water ingre...

Страница 6: ...scopic PVC air duct is adjustable The outer grille is made of high quality UV resistant ASA plastic The solar panel is attached to the surface of the hood to power the motor DESIGN AND OPERATING PRINCIPLE The solar battery provides autonomous power for the fan motor The fan creates a more intense air exchange than with conventional passive ventilation The electrical parameters of the battery vary ...

Страница 7: ...epare a round core hole in the outer wall The diameter of the hole depends on the specific model of the ventilator and is indicated in the table of overall dimensions in the Technical data section Ø D1 min 300 min 300 min 300 A A A A 2 Install the telescopic air duct in the hole in such a way that its sections coincide with the outer and inner surface of the wall For ease of installation use mount...

Страница 8: ... FOR THE PROPER AND CONSISTENT FUNCTIONING OF THE UNIT ANY UNAUTHORISED ALTERATIONS TO THE UNIT FORM FACTOR OR FAILURE TO ADHERE TO THE ELECTRICAL CONNECTIONS DIAGRAM SHALL RELIEVE THE MANUFACTURER FROM LIABILITY FOR ANY RESULTING MALFUNCTIONS AND VOID THE UNIT WARRANTY 4 Install the internal grille 5 Adjust the airflow regulator Closed Open 6 Assemble the internal grille ...

Страница 9: ...ry is dirty Clean the solar battery Noise vibration The impeller is clogged Clean the impeller Loose screw connection of the unit casing or the outer ventilation hood Tighten the screws of the ventilator or the outer ventilation hood TROUBLESHOOTING STORAGE AND TRANSPORTATION REGULATIONS Store the unit in the manufacturer s original packaging box in a dry closed ventilated premise with temperature...

Страница 10: ...the Seller for warranty service The manufacturer s warranty does not apply to the following cases User s failure to submit the unit with the entire delivery package as stated in the user s manual including submission with missing component parts previously dismounted by the user Mismatch of the unit model and the brand name with the information stated on the unit packaging and in the user s manual...

Страница 11: ...RTIFICATE The _____________________________________ unit is installed pursuant to the requirements stated in the present user s manual Installation Stamp Company name Address Phone Number Installation Technician s Full Name Installation Date Signature The unit has been installed in accordance with the provisions of all the applicable local and national construction electrical and technical codes a...

Страница 12: ...www blaubergventilatoren de B227EN 01 ...

Отзывы: