
11
Order of Operation
Start up
•
Start the BMR-25P
•
Run the machine up to 3600-3700 RPM
•
Press the free flow button and wait for the head to lower (approximately 5 seconds)
•
Once all casters on the blasthead are on the ground, press the clutch on button.
•
Using the shifter, accelerate the machine to the desired speed.
•
Once you are at your desired speed, press the “shot valve open” button. THE MACHINE MUST BE MOVING
BEFORE YOU OPEN THE SHOT VALVE. FAILURE TO DO SO WILL RESULT IN DAMAGE TO THE SURFACE
YOU ARE BLASTING.
Shut down
•
Approximately 10 feet (distance will vary due to machine speed) from the end of your blast lane, press the
“shot valve close” button with the machine moving until the shot cycles through. DO NOT STOP THE
MACHINE UNTIL THE SHOT HAS MADE ITS WAY THOUGH THE SYSTEM. FAILURE TO DO SO WILL RESULT
IN DAMAGE TO THE SURFACE YOU ARE BLASTING.
•
Once the shot valve is closed and the shot has cycled through, you may press the “clutch off” button.
•
Idle down the machine.
•
Turn the key to off.
Содержание BMR-25P
Страница 1: ...OPERATING MANUAL BMR 25P VERSION 1 0 ...