2
*Parallel connectivity and operations can be configured in several
different modes, however speed and performance will decrease as
each additional units are paralleled together. Refer to section 3.6
Parallel Operation and 4.1 RS-485 for more details regarding the
configuration, setup, and limitations.
If you wish to connect more than 10 units in parallel, we advise to
contact us at
1.2
Package Contents
Please inspect the instrument mechanically and electrically upon
receiving it. Unpack all items from the shipping carton, and check for
any obvious signs of physical damage that may have occurred during
transportation. Report any damage to the shipping agent immediately.
Save the original packing carton for possible future reshipment. Every
power supply is shipped with the following contents:
1 x PVS10005, PVS60085, or PVS60085MR Power Supply
1 x AC Power Cord
1 x Certificate of Calibration
1 x Test Report
Verify that all items above are included in the shipping container. If
anything is missing, please contact B&K Precision.