BJM Pumps PGV 110 Скачать руководство пользователя страница 1

Version 4/10/2013 

 

 

INSTALLATION, OPERATION & MAINTENANCE MANUAL 

 

PGV SERIES 

VERTICAL DISCHARGE  

Horizontal Electric Submersible Pumps 

 

CAST IRON 

Three Phase 

460V 

PGV 55 

PGV 75 

PGV 110 

 

Three Phase 

460V 

PGV 220 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Read this manual carefully before installing, operating or servicing these pump models. 

U

Observe all safety information.

U

 Failure to comply with instructions may result in personal 

injury and/or property damage. Please retain these instructions. 

 

 

Содержание PGV 110

Страница 1: ...Pumps CAST IRON Three Phase 460V PGV 55 PGV 75 PGV 110 Three Phase 460V PGV 220 Read this manual carefully before installing operating or servicing these pump models UObserve all safety information U...

Страница 2: ......

Страница 3: ...NG 8 INTENDED METHODS OF CONNECTION 9 THREE PHASE WIRING INSTRUCTION 9 PUMP OPERATION 11 MAINTENANCE AND INSPECTION 12 DISPOSAL OF PUMP 13 TROUBLE SHOOTING 13 ASSEMBLING 18 SECTIONAL VIEW OF PGV55 75...

Страница 4: ...and performance curves is also available on our web site HUwww bjmpumps comU For assistance with your electric power source please contact a certified electrician Please pay attention to the following...

Страница 5: ...ric power cable Death or serious injury could occur Never attempt to alter the length or repair any power cable with a splice The pump motor and pump motor and cable must be completely waterproof Dama...

Страница 6: ...t a pump with machine connected using only the lifting rings of the pump Failure to observe this caution may cause injury or damage to the product Do not lift by cables Failure to observe this caution...

Страница 7: ...TALLATION 1 Inspect each part component to verify that it is free of damage and imperfections 2 Do not lift or move the pump by the power cable Use the lifting handle or eye bolt attachment to support...

Страница 8: ...ge to the pump or personal injury may result from alterations 1 Voltage and frequency check check whether the supply voltage and frequency meet those indicated on the pump name plate 2 Power connectio...

Страница 9: ...ically operate a non automatic three phase pump a control panel is required Follow the instructions provided with the panel to wire the system for automatic three phase pumps see automatic three phase...

Страница 10: ...ntry during temporary limited submersion and shall comply with the applicable requirements of the Standard for Enclosures for Electrical Equipment UL 50 or the standard for Metallic Outlet Boxes UL 51...

Страница 11: ...n the specified liquid temperature For high temperature liquid specification refer to the catalogue Failure to observe this caution may cause injury For pumps with cutting mechanism never rotate in re...

Страница 12: ...of high density water where sand slurry and other solids are much contained in the pumping of water the shaft power increases with increasing mixture density of solids and the motor is eventually ove...

Страница 13: ...deral state and local regulations TROUBLE SHOOTING Disconnect the power source to the pump BEFORE attempting any type of trouble shooting service or repair Warning Pump will restart automatically when...

Страница 14: ...vel or stop the pump 4 Small pumping rate capacity Reverse rotation of pump Interchange two wires of the cable for correct rotational direction Impeller clogged with foreign matter Remove foreign matt...

Страница 15: ...ided with two oil plugs spaced at 180 from each other one is located upside from the shaft center and other located downside from the shaft center as illustrated in Fig 3 As illustrated in Fig 3 locat...

Страница 16: ...on carefully inspect it when the suction pumping capacity decreases too Refer to section 6 4 Other Inspection check the bolts and nuts for loose damaged and deformation 5 Overhauling overhaul the pump...

Страница 17: ...in the procedure given below Step Part Name part No in sectional DWG Overhauling Procedure Part No in sectional DWG Note 1 Strainer 16 Unscrew off stud nut SN1 2 Bottom Plate 15 Unscrew off stud nut S...

Страница 18: ...seal packing with new ones Tighten securely bolts and screws with specific tightening torque After assembled turn the impeller by hand to check its smooth rotation After operation Maintenance When th...

Страница 19: ...19 SECTIONAL VIEW OF PGV55 75 110...

Страница 20: ...20 SECTIONAL VIEW OF PGV220...

Страница 21: ...rd 201887 201880 201881 1 27 1 Bell Mouth 201891 201885 201886 1 27 2 Terminal Box 201924 201890 201890 1 27 2 1 O ring BUNA N 201895 201914 201920 1 28 Cable Packing 201899 201893 201894 1 28 1 Cable...

Страница 22: ...using 201877 1 26 1 O ring BUNA N 201922 1 27 Power cord 201882 1 27 1 Bell Mouth 201887 1 27 2 Terminal Box 201891 1 27 2 1 O ring BUNA N 201924 1 28 Cable Packing 201895 1 28 1 Cable Washer 201899 1...

Страница 23: ...IS EXPRESSLY AGREED THAT THIS SHALL BE THE SOLE AND EXCLUSIVE REMEDY OF BJM PUMPS LLC S DISTRIBUTORS AND CUSTOMERS UNDER NO CIRCUMSTANCES SHALL BJM PUMPS LLC BE LIABLE FOR ANY COSTS LOSS EXPENSE DAMA...

Страница 24: ...r Condition of Cable Jacket New Good Fair Poor Rotation Direction of Impeller Rotation Use C W for clockwise CC W for counterclockwise Method used to check rotation viewed from bottom Resistance of ca...

Страница 25: ...top Yes No Control Panel MFG model no Number of pumps operated by control panel NOTE At no time should hole be made in top of control panel unless proper sealing devices are utilized Short Circuit pr...

Страница 26: ...hecked for leaks Yes No Do check valves operate properly Yes No Flow Does station appear to operate at proper rate Yes No Noise level Acceptable Unacceptable Comments Describe and equipment difficulti...

Страница 27: ...NOTES...

Страница 28: ......

Страница 29: ......

Страница 30: ...23 Spencer Plain Road PO Box 1138 Old Saybrook CT 06475 USA Phone 860 399 5937 Fax 860 399 7784 Email sales bjmpumps com Web Site www bjmpumps com Copyright 2008 2013 BJM Pumps LLC All rights reserved...

Отзывы: