background image

 

 
 

Содержание AutoFill V2

Страница 1: ......

Страница 2: ...3 2 Overview 4 2 1 Display overview 4 2 2 Board overview 5 3 Safety symbols 6 4 Installation 7 4 1 General 7 4 2 Groundwire 7 4 3 Power supply 7 4 4 Ready contact 7 4 5 Alarm contact 7 5 The sensor 8...

Страница 3: ...tower 1 Airfilter 1 Control Box 1 4 0m granulate hose with a venturi and 10mm air tube 1 Hose clamp 1 Washer levelsensor 2 Allen head screw M6 x 16 1 Set of electrical components Optional Vibrating el...

Страница 4: ...Sensor Is lit if level is ok 2 LED Hand Is lit when turned on manual 3 Button Hand Manual control 4 LED Alarm Is lit when there is more than 1 minute output 5 LED Output Is lit when 24V DC is send to...

Страница 5: ...4 Alarm Alarmsignal to e g siren alarmlight 5 Supply low 6 Release in Ready signal from hotmelt unit 7 J3 Sensor connector 8 J8 Ground Ground Figure 3 Description Function 1 Dipswitch 1 Calibrate leve...

Страница 6: ...f burning Appliance parts have a high operation temperature Caution high voltage This type of work can only be carries out by qualified personal Caution possible danger of uncontrolled release leakage...

Страница 7: ...Preferably connect to the power behind the mainswitch 4 4 Ready contact Connect the brown and blue wire to the ready signal from the hotmelt unit Use the grey and black wire for the release contact of...

Страница 8: ...AutoFill V2 T 0031 0 348 563 839 W www bithotmelt com 8 5 The sensor 5 1 Adjust the levelsensor Figure 4...

Страница 9: ...at the sensor is at least 40mm in the adhesive Step 5 Wait at least 5 minutes for the sensor to reach the adhesive temperature The range in the sensor is 5mm from the bottom of the sensor till 20mm fr...

Страница 10: ...n valve Step 8 Fasten the filltower to the synthetic base Wait at least 5 minutes to ensure that all liquid adhesive is dript of the sensor Step 9 Press button auto Low level is now saved Calibrating...

Страница 11: ...ked with glue then it is possible that the air can t get out of the system Overpressure can be a consequence Important check and clean both filters regularly Between filltower and synthetic base there...

Страница 12: ...2 Control unit 25 203 0004 1 3 Cable gland M12 75 003 0001 4 4 Air valve 2 2 24V DC 03 001 0050 1 5 Synthetic base 1 1 6 Washer 25 008 0002 1 7 Levelsensor V2 incl cable gland M12 25 202 0002 1 8 Mai...

Страница 13: ...ill V2 T 0031 0 348 563 839 W www bithotmelt com 13 Figure 6 Side view AutoFill Description Partno QTY 12 Filltower AutoFill 25 006 0003 1 13 Mounting bracket 25 008 0005 1 14 Bolt M5x10 2 15 Bolt M6x...

Страница 14: ...07 0002 1 4 Venturi 25 007 1001 1 Figure 8 Mainboard Figure 9 Transformer 24V DC Artikelomschrijving Artikelnummer Aantal Container 120L with window blue standard not shown 25 004 1001 1 Mainboard Aut...

Страница 15: ...w the venturi immediately starts to transport the granulate Sensor does not respond Take the sensor out of the glue Wear a glove and grab the sensor by the range see figure 4 Does the sensor responds...

Отзывы: