1
¨
Inspect all contents prior to installation. Report any missing parts to dealer immediately.
¨
Read all instructions before proceeding.
¨
Save this instruction in the event that the manufacturer must be contacted in the future.
——
Installation and Safe Use Manual
——
MODELS PR74, PR75, PR75XL, PR76, PR77, PR77XL, PR78,
PR79, PR79XL, PR87, PR87XL, BA780 AND BA780XL POLES
ORDERED SEPARATELY
Mega Duty Gooseneck Basketball Systems
1.
Call your local utility locator service, usually by dialing 811, before digging to avoid serious injury or
service interruption.
2.
Select the location for the concrete base footing. Note that the face of the
Backboard
(P) will be distanced
from the center of the footing according to information in Figure 12. Dig a 12” diameter hole that is 48”
deep, remove additional soil from the bottom 1/3
-
1/2 of the hole in a bell shape to add pole stability. In
areas where the normal frost line is below 48” it is advisable to dig to the normal frost line. See Figure 1.
3.
Make sure that you have a level and a broomstick or similar pole to vibrate air pockets out of concrete. A
12” diameter by 48” deep hole with a bell bottom will require approximately 5 cubic ft. of
Quick Dry Concrete
(S). You will need to adjust the amount depending on the size of hole you prepared.
Having too much is better than having too little.
4.
Mix concrete according to the directions on the bag. It is advantageous to have the mixture “wet”. This
will increase your working time and allow batches to mix in the hole. Pour the hole full to ground level.
Implementation Date: 11/08/22 Rev: 1 N.J.C. File: E:\ pub\Instructions\Pole systems Ref#: 920476 Author: L.M.
Customer Service
(800) 247
-
7668
P A R T S L I S T
Item
Qty
Description
Item
Qty
Description
A
1
Gooseneck Pole
L
2
7/16” Hex Nut
B
1
Backboard Mounting Adapter
M
2
Backboard Brace
C
3
Band Clamp
N
2
1/2” Square Head Set Screw
D
2
7/16” x 2” Carriage Bolt
O
2
1/2” Jam Nut
G
2
3/8” Lock Washer
R
1
1/4” x 1” Roll Pin
K
2
7/16” Lock Washer
V
2
Backboard Spacer Plate
J
2
7/16” Flat Washer
U
1
Backboard Conversion Plate (only required on some
systems)
I
3
5/16” Flange Nut
T
1
Pole Pad (optional)
H
3
5/16” x 2” Carriage Bolt
S
TBD
Quick Dry Concrete (supplied by costumer)
F
2
3/8” Flat Washer
Q
1
Rim and Net
E
2
3/8” x 1” Hex Bolt
P
1
Backboard
WARNING!
IMPROPER INSTALLATION, MAINTENANCE OR USE MAY CAUSE FAILURE AND SERIOUS PERSONAL
INJURY.