Page 1
P A R T S L I S T
Item
Qty
Description
Item
Qty
Description
A
1
Gooseneck Pole
L
2
7/16”
Lock Washer
B
1
Backboard Mounting Bracket
M
2
7/16”
Hex Nut
C
3
Band Clamp
N
2
Backboard Brace
D
2
7/16”
x
2”
Carriage Bolt
O
2
1/2”
Set Screw, Square Head
E
2
3/8”
x
1”
Hex Bolt
P
2
1/2”
Jam Nut
F
2
3/8”
Flat Washer
Q
1
Backboard (packaged separately)
G
2
3/8”
Lock Washer
R
1
Rim, Mounting Hardware, & Net (packaged separately)
H
3
5/16”
x
2”
Carriage Bolt
S
1
1/4”
x
1”
Roll Pin
I
2
5/16”
x
1”
Carriage Bolt
T
TBD
Quick Dry Concrete (supplied by customer)
J
5
5/16”
Flange Nut
U
1
Pole Pad (optional)
K
2
7/16”
Flat Washer
V
1
Removable Rim Bracket Kit (PR33 only, packaged separately)
Inspect all contents prior to installation. Report any missing parts to dealer immediately.
Read all instructions before proceeding.
Save this instruction in the event that the manufacturer must be contacted in the future
——
Installation & Safe Use Manual ——
Models: PR20, PR29, PR31, PR33,
and BA775 poles ordered separately
Tough Duty Gooseneck Basketball Systems
Date: 5/19/2021 Rev: 9 B.A. N.J.C. File: Bisonserver/publisher/instructions/BA775 Ref#:920099
Customer Service
(800) 247
-
7668
1.
Call your local utility locating service, usually by dialing 811, before digging to avoid serious injury or
service interruption.
2.
Select the location for the concrete base footing. Note that the face of the
Backboard
(Q) will be ap-
proximately
38”
from the center of the footing. Dig a
12”
diameter hole that is
36”
deep. Remove
additional soil from the bottom 1/3
-
1/2 of the hole in a bell shape to add pole stability. In areas where
the normal frost line is below
36”
it is advisable to dig to the normal frost line. See Figure 1.
3.
Make sure that you have a level and a broomstick or similar pole to vibrate air pockets out of concrete.
A
12”
diameter by
36”
deep hole with a bell bottom will require approximately 3 cubic ft. or 3000 PSI
Quick Dry Concrete
(T). You will need to adjust the amount depending on the size of hole you
prepared. Having too much is better than having too little.
4.
Mix concrete according to the directions on the bag. It is advantageous to have the mixture
“
wet
”.
This
will increase your working time and allow batches to mix in the hole. Pour the hole full to ground
level.