background image

1

 

 

Inspect all contents prior to installation.  Report any missing parts to dealer immediately.

 

 

Read all instructions before proceeding.

 

——

 

Instruction Manual ——

 

D

IRECT

 B

URY

 S

QUARE

 B

ASKETBALL

 

P

OLE

 I

NSTALLATION

 A

ID

 K

IT

 

 

1.

 

Using the two 

1/4

-

20 X 

8” 

Carriage Bolts 

(A) and 

1/4

-

20 Wing Nuts 

(B) provided, sandwich the two         

Pre

-

Drilled Wooden Panels 

(C) around the pole at a location where the square pole protrudes from the 

footing. Use the set of holes in the 

Pre

-

Drilled Wooden Panels 

(C) that are closest to the sides of the pole 

depending on pole size. Position them as shown in the illustration to allow clearance above the concrete 

footing. See Figure 1.

 

 

2.

 

Tension the 

1/4

-

20 Wing Nuts 

(B) so that the wood cannot move up or down on the pole once you are 

satisfied that the pole is protruding above the court surface the height specified in the pole

s instructions.

 

      See Figure 1.

 

 

3.

 

Adjustment of the angle of the 

Pre

-

Drilled Wooden Panels 

(C) on the pole to match the ground surface 

adjacent to the footing by slightly loosening and re

-

tightening the 1

/4

-

20 Wing Nuts 

(B) will help keep the 

pole plumb while concrete is curing.

 

 

4.

 

Discard this installation aid once footing is cured.

 

Date: 5/4/2021                   Rev:  1                         B.A.               N.J.C.                 File: \ pub\Direct BuryPoleInstallationAid                Ref#: 920460

 

Customer Service     

(800) 247

-

7668

 

P A R T S   L I S T 

 

Item

 

Qty

 

Description

 

Item

 

Qty

 

Description

 

A

 

2

 

1/4

-

20 X 

8” 

Carriage Bolt

 

B

 

2

 

1/4

-

20 Wing Nut

 

C

 

2

 

Pre

-

Drilled Wooden Panels

 

 

 

 

DISCLAIMER:

 

This installation aid is intended for use on 

4” 

square, 

5” 

square, and 

6” 

square basketball poles to help keep 

the pole from sinking into the concrete in the footing while curing, leaving the pole extended to the height 

specified on the instructions provided with the system. It is not intended to be the sole method of maintaining 

the height or perpendicularity of the pole!

 

  

WARNING:

 

Always confirm the following while the concrete is still wet and the pole is still adjustable for a satisfactory 

final installation:

 

• 

Top of pole is correct height from the playing surface

 

• 

The flat, front face of the square pole is parallel to the court

 

• 

The Pole is plumb in both directions

 

All manuals and user guides at all-guides.com

Отзывы: