BIRD BA-300 Series Скачать руководство пользователя страница 20

11

Figure 4    BA-310 Schematic

N    L

L1

L2

L1

L2

ROTATION

FANS

GRN/YEL

AC

RECEPTACLE

WHT/YEL

TO CONTROL

THERMOSWITCH

BLACK

RED

TOGGLE

SWITCH

WHT/BLK

WHT/BLK

INDICATOR

LIGHT

WHT/BLK

Storage and Shipment

Cover

 

the

 

Bird

 

BA

 

 

300/310

 

before

 

storing

 

to

 

keep

 

out

 

dust

 

and

 

dirt.

 

Store

 

in

 

a

 

dry,

 

dust

free

 

environment

 

where

 

the

 

ambient

 

temperature

 

will

 

remain

 

between

 

 

40

 

and

 

+45

 

°C

 

(–

 

40

 

to

 

+113

 

°F).

To

 

ship

 

the

 

blower

 

assembly,

 

take

 

the

 

following

 

precautions:

Detach

 

the

 

power

 

cable

 

and

 

tape

 

it

 

securely

 

to

 

the

 

housing.

To

 

ship

 

the

 

blower

 

assembly

 

by

 

itself,

 

pack

 

it

 

in

 

a

 

sturdy

 

corrugated

 

paper

 

shipping

 

carton.

 

If

 

it

 

is

 

attached

 

to

 

a

 

load,

 

a

 

wood

 

crate

 

is

 

recommended

 

because

 

of

 

size

 

and

 

weight.

Customer Service

Any

 

maintenance

 

or

 

service

 

procedure

 

beyond

 

the

 

scope

 

of

 

those

 

in

 

this

 

chapter

 

should

 

be

 

referred

 

to

 

a

 

qualified

 

service

 

center.

If

 

the

 

unit

 

needs

 

to

 

be

 

returned

 

for

 

any

 

reason,

 

request

 

an

 

Return

 

Material

 

Authorization

 

(RMA)

 

through

 

the

 

Bird

 

Technologies

 

website.

 

All

 

instruments

 

returned

 

must

 

be

 

shipped

 

prepaid

 

and

 

to

 

the

 

attention

 

of

 

the

 

RMA

 

number.

Bird Service Center

30303

 

Aurora

 

Road

Cleveland

 

(Solon),

 

Ohio

 

44139

2794

Fax:

 

(440)

 

248

5426

E

mail:

 

[email protected]

For

 

the

 

location

 

of

 

the

 

Sales

 

Office

 

nearest

 

you,

 

visit

 

our

 

Web

 

site

 

at:

http://www.birdrf.com

Содержание BA-300 Series

Страница 1: ...bly Models BA 300 BA 310 Operation Manual Copyright 2016 by Bird Technologies Inc Instruction Book Part Number 920 BA 300 310 Rev G Termaline and Tenuline are Registered Trademarks of Bird Electronic...

Страница 2: ...remove the RF transmission line while RF power is present WARNING Do Not Service Or Adjust Alone Under no circumstances should any person reach into an enclosure for the purpose of service or adjustm...

Страница 3: ...onal injury CAUTION Caution notes call attention to a procedure which if not correctly performed could result in damage to the instrument The caution symbol appears on the equipment indicating there i...

Страница 4: ...d is operating or cooling Failure to do so could result in an explosion or severe burns WARNING Disconnect the unit from all power sources before servicing The unit may be energized from multiple sour...

Страница 5: ...with the load s vent plug up Do not use in any other manner CAUTION If installed connect optional interlock before applying RF power CAUTION Check the local electrical code for proper ac hookup prior...

Страница 6: ...RIDAD DEL INSTRUMENTO BENUTZUNG WIRD DAS GER T AUF ANDERE WEISE VERWENDET ALS VOM HERSTELLER BESCHRIEBEN KANN DIE GER TESICHERHEIT BEEINTR CHTIGT WERDEN UTILISATION TOUTE UTILISATION DE CET INSTRUMENT...

Страница 7: ...S GER TES GELTEN NUR F R GESCHULTES FACHPERSONAL ZUR VERMEIDUNG GEF HRLICHE ELEKTRISCHE SCHOCKS SIND WARTUNGSARBEITEN AUSSCHLIE LICH VON QUALIFIZIERTEM SERVICEPERSONAL DURCHZUF HREN ENTRENTIEN L EMPLO...

Страница 8: ...refer to the part number and revision on the title page Chapter Layout Introduction Describes the features of the blower lists equipment supplied and optional equipment Theory of Operation Describes t...

Страница 9: ...pter 3 Installation 3 Unpacking and Inspection 3 Mounting 3 Installing Thermoswitch BA 310 Only 3 Thermoswitch Connection BA 310 Only 4 Load Resistor 5 AC Power Hookup 5 Chapter 4 Operating Instructio...

Страница 10: ...a thermoswitch wired in parallel with the power switch When a load equipped with a fan control thermoswitch is properly connected the blower will automatically turn on in response to a rise in load te...

Страница 11: ...er Assembly baffles cover the radiator fins so that the high airflow generated by two blower fans is confined to passing over the fins Up to twice as much RF energy can be dissipated by this forced dr...

Страница 12: ...8 9 53 mm diameter max Installing Thermoswitch BA 310 Only The Bird BA 310 requires a control thermoswitch P N 2450 085 for automatic operation It is normally open closing at 155 C 311 F with a ratin...

Страница 13: ...he base 2 Thread the control switch wires through the clamp E with the washers F inside and with its threaded fitting in place Service the control switch wire with short tips and put spaghetti sleeves...

Страница 14: ...e It may be necessary to temporarily loosen the two screws in the unremoved vertical panel Tighten all the side panel and base mounting screws securely Push the power cable s plug into the socket at t...

Страница 15: ...NUAL momentarily to check that the fans are working properly Apply RF power Operation Under Abnormal Conditions If the indicator light turns off or the fans stop unexpectedly immediately turn off the...

Страница 16: ...at the source If the load is equipped with an interlock thermoswitch RF power will be automatically turned off when the coolant temperature reaches an unsafe level Use of an interlock thermoswitch is...

Страница 17: ...assembly it will be necessary to partially disassemble the blower to clean the load s radiator fins Follow the instructions below WARNING Never attempt to connect or disconnect RF equipment from the t...

Страница 18: ...lude stuck or blocked fans or a short circuit in the motor or blower wiring Press the locking tab on the fuse drawer and remove the drawer Replace the fuse See Specifications on page 12 for fuse type...

Страница 19: ...not to lose the lipped retaining washers 5 Insert the replacement fan with the fan blade assembly facing down towards the fan guard grill 6 Insert the mounting screws and retaining washers into the mo...

Страница 20: ...embly by itself pack it in a sturdy corrugated paper shipping carton If it is attached to a load a wood crate is recommended because of size and weight Customer Service Any maintenance or service proc...

Страница 21: ...ad in place 215 8 L x 73 8 W x 171 4 H 548 x 187 x 436 mm Weight Nominal 13 5 lb 6 1 kg Finish Grey Powder Coat DESCRIPTION QTY PART NUMBER Control Thermoswitch BA 310 only 1 2450 085 Side Panel Screw...

Страница 22: ...ry such claim for breach of these warranties shall be deemed to be waived by Buyer unless made in writing within ten days from the date of discovery of the defect The above warranties shall not extend...

Отзывы: