INSTALLATION AND MAINTENANCE

INSTALLATION PLACE REQUIREMENT

Equipment should be installed indoors, with clean, adequate light and a good air circulation environment. It is
prohibited to be installed in the environment of exposure to sunlight, rain, water vapour, moisture, corrosive
gas, explosive gas and dust.
Environment temperature should be lower than 40

℃,

humidity lower than 70

(preferably, install air

conditioner for cooling and drying). Environment temperature too high may lead to equipment cease and
lower ozone generator production. High humidity may lead to controlling circuit malfunction or damage.
The distance between equipment and wall, ceiling should be more than 600mm, which is convenient for
future maintenance.
Equipment should be installed on solid, horizontal ground. Installing on uneven ground may lead to a high
level of equipment noise and vibration.

PIPING INSTALLATION

Gas input pipe

DN20 PVC or 12*8 PU pipe is suggested. The inner diameter needs to be over 15mm if the
gas source is air and over 8mm if it is oxygen.

Cooling water pipe

DN20 PVC is suggested. The inner diameter needs to be over 10mm.

Ozone output pipe

304/316 stainless steel pipe or PTFE pipe is suggested. The inner diameter needs to be
over 15mm if the gas source is air and over 8mm if the gas source is oxygen. Otherwise, the
inner pressure is too high which will lead to arcing, and main circuit board damage.

ELECTRICAL CONNECTION

The connection cable size should not be less than specified in the specification, and when cable
length is more than 10 meters, a bigger size should be used.

The power source should meet the voltage and frequency requirement.

The voltage fluctuation cannot be too high, and it should be within the range of -10%~+10% of the
nominal voltage. It cannot be used if voltage is out of range, otherwise it will cause equipment
damage, and voltage stabiliser or regulator should be used to meet the voltage range.

Voltage unbalance of the three phases cannot be too high, and should be within 5%. Stabiliser

should be used if there is high fluctuation.

ON / OFF PROCEDURE

Check before operation: check whether equipment input piping, cooling water piping, ozone output
piping are in good connection, whether power sources meet the equipment voltage requirement.

11

Содержание AQUAZONE 200G

Страница 1: ...d ventilation To prevent backflow water gas liquid mixing connections should be installed strictly according to this guide At least allow 5 seconds to turn on and off the ozone generator Please keep t...

Страница 2: ...4 1 CONTROL PANEL DESCRIPTION 6 300G INTERFACE 8 200G 400G AND 600G INTERFACE TWO SETS MODULAR DESIGN 9 4 20MA ANALOG SIGNAL RECEIVING PORT 10 INSTALLATION AND MAINTENANCE 11 INSTALLATION PLACE REQUI...

Страница 3: ...ill lead to equipment oxidised and is harmful to staff around Staff is prohibited to enter the space when the machine is being used for space sterilisation In other words business time and sterilisati...

Страница 4: ...s to be in good ventilation and install an exhaust fan if necessary The ambient humidity must not be higher than 90 otherwise there will be water drops inside the equipment causing electricity leakage...

Страница 5: ...ated power supply unit which has comprehensive control and protection The modular design has also made it quite simple for maintenance Anti moisture HV transformer design The HV transformer is sealed...

Страница 6: ...design 3 5A each set Two sets modular design Power 2 5 3 5 4 8 7 0 Working pressure 0 2bar Cooling water flow 25 6LPM 10LPM 12LPM 20LPM Ambient temperature 40 Ambient humidity 70 Cooling water input...

Страница 7: ...the specification Equipment overcurrent protection This feature is reserved IGBT overcurrent protection This feature is reserved High voltage transformer overheat protection When the indicator lights...

Страница 8: ...7...

Страница 9: ...water outlet Outlet water temperature should be lower than body temperature feeling cool otherwise a higher flow is required Ozone outlet A non returning check valve and backflow water prevention dev...

Страница 10: ...200G 400G AND 600G INTERFACE TWO SETS MODULAR DESIGN 9...

Страница 11: ...4 20MA ANALOG SIGNAL RECEIVING PORT 10...

Страница 12: ...xygen Cooling water pipe DN20 PVC is suggested The inner diameter needs to be over 10mm Ozone output pipe 304 316 stainless steel pipe or PTFE pipe is suggested The inner diameter needs to be over 15m...

Страница 13: ...mable material accessories and the L series products from Biozone are warranted for one year from the date of purchasing The following occasions are excluded from the warranty and Biozone may charge f...

Страница 14: ...net Clean replace Cycling clean Dry moisture on high voltage parts Clean Maintain during humid season Inner side of internal and external electrode Clean Regular clean when used in beverage and food...

Страница 15: ...se cooling water flow 5 Disconnect the 4 20mA signal and check 6 Replace potentiometer 7 Replace the digital power supply unit 4 Low ozone output low current over 0 5A but lower than rating current Ad...

Страница 16: ...SU output cables Check HV transformer and the connections Clean the cooling channels replace cooling fan Lower ambient temperature E11 PSU IGBT over heated Cooling fan channel blocked or cooling fan i...

Страница 17: ...CONTACT US 16...

Отзывы: