background image

 

          

www.biomark.com                           +1 208.275.0011 

 

[email protected]

 

 

         

 

 

 

 

 

 

 

 

Overview 

The Biomark 

Submersible Battery

 

is shipped unassembled. This document covers the 

assembly of the 

72 Ah 

(2-week runtime)

 or 180 Ah 

(4-week runtime) submersible battery pack.  

Please follow these procedures to successfully install and seal your submersible battery pack.  

Failure to follow manufacturer guidelines and specifications may void Biomark’s manufacturer’s 

warranty. 

Shipment includes: 

  (1) Submersible battery enclosure 

  (1) Submersible battery enclosure entry plate with Battery Management System (BMS) & 

Wiring 

  (1) Sealing Gasket 

  (2) Foam inserts 

  (40) Stainless Steel ¼-20 x 2.5” partially threaded hex head screw – 7/16” hex size  

  (80) Stainless Steel .281” ID .625” OD – standard ¼” flat washers used  

  (80) Stainless Steel Nylon-Insert Locknut, 1/4"-20 Thread Size- 7/16” hex size 

  Bus Bar Kit 

o

  Each kit will include (2) Vertical and (1) Horizontal bus bars with the following 

battery terminal hardware: 

o

  72Ah Battery Terminal Hardware 

  (8) M6 - 1 x 12mm full thread hex head screw– 10mm hex size 

       QUICK START GUIDE 

SUBMERSIBLE BATTERY 

ASSEMBLY & INSTALLATION

 

 

Содержание Submersible Battery

Страница 1: ...ent includes 1 Submersible battery enclosure 1 Submersible battery enclosure entry plate with Battery Management System BMS Wiring 1 Sealing Gasket 2 Foam inserts 40 Stainless Steel 20 x 2 5 partially...

Страница 2: ...inch pounds in lbs Use a minimum of 30 inch pounds of torque until you hear an audible click or until the split washer is fully compressed and the bolt is firmly secure Assembly Installation Instructi...

Страница 3: ...orientation is positive negative Install Battery cell 1 into top left position of battery box orientation is positive negative TIP Battery box is constructed for tight fit of each cell within box allo...

Страница 4: ...ng terminal bus bar Install bolt ring terminal bus bar assembly into positive terminal of battery cell 1 and hand tighten Install remaining terminal bolt into bottom hole of vertical bus bar and into...

Страница 5: ...late and Red wire labeled 3 from BMS are placed onto terminal bolt and secured to positive terminal of battery 3 Repeat similar steps to install negative Black wire extending from battery pack entry p...

Страница 6: ...itional wire connections orientate all ring terminals towards the middle of the grouped batteries This will allow for proper placement of foam inserts described in the following step Step 7 Install Fo...

Страница 7: ...ery pack flange ADVISORY Ensure all wires clear entry plate sealing gasket and battery box flange Failure to prevent pinching of internal wiring may result in severed electrical connection or improper...

Страница 8: ...ed torque screwdriver fixed with a 7 16 socket and 7 16 combination wrench Torque specifications for sealing hardware is 30 inch pounds in lbs The recommended torqueing pattern is spiral tightening se...

Страница 9: ...e Diagram Once the battery pack has been assembled properly sealed and proper voltage verified no maintenance or periodic servicing is required If you have any questions regarding the battery installa...

Страница 10: ...iomark Lithium ION battery Packs Charge Cycle Duration Average charge cycle varies depending on battery condition DO NOT use Biomark provided battery charger on any other battery pack DO NOT use any o...

Страница 11: ...ctor switch of charger to ON position LED indicator will display charge status and illuminate Green when charging cycle is complete Once charged replace protective pipe plugs over positive and negativ...

Отзывы: