SYSTEM SHUT-DOWN
The Atomlab 950 system is now fully set up and ready for operation. Before it can be moved, however, it
must be shut down using the following procedure.
1.
At the Windows Desktop screen, which should now be displayed, move the trackball pointer over
the “Atomlab950” icon and double-click the mouse. The About Atomlab950 screen should now be
displayed. A calibration status box is located on the right side of this screen.
2.
Look below the version number of the Atomlab software (under the Biodex Address on the left side
of the screen) and check the detector status. If the cables are connected properly at this point, there
will be a message reading "Connected To MCA."
NOTE: If the message reads "Device Not Found," reconnect the cables leading to the MCA and check all other
connections. If the system will not connect to the MCA, click on <No> and then click on <Yes> to advance to
Simulation mode. You can then exit Simulation mode by clicking on <File> at the top of the screen, selecting
<System Setup>, and then clicking on <Simulation Mode> to remove the check mark. See "System Software
Set Up."
3.
If the detector status is okay, click on <OK> to advance to the MCA Operation screen.
4.
Move the pointer over the <X> at the top right corner of the screen and click the left trackball button
to exit. The Windows Desktop should now be displayed.
5.
Select <Start>. Now click on <Shut Down> and then <OK>. The system will now take several
seconds to shut down the computer. When finished, a message will appear on the screen noting that
it is safe to turn the system OFF. Turn the power strip off at this time. You can now unplug the
system and move it to the location where it will be used.
NOTE: The push handle can be used as a wire wrap to hold the uptake stand power cord during transport.
GENERAL CLEANING INSTRUCTIONS
As required, wipe down the exterior of the unit using a soft rag slightly dampened with alcohol.
POWER-UP AND SELF-TEST
(See Figures 2-3 and 2-4.)
At this point, your Atomlab 950 Medical Spectrometer should be fully ready for operation. It is
recommended that the system be turned ON at least one hour before use or, if possible, left on at all
times. This will provide optimum performance and will not effect the longevity of any part or component
except the monitor, which should be turned OFF if the Atomlab 950 will not be used for a prolonged
period of time.
To Power-Up And Run The Self-Test
Turn on all components, including the printer. The system may immediately advance to the Atomlab 950
program. If not, double-click on the <Atomlab950> icon from the system desktop. Once the Atomlab 950
program is activated, the system immediately performs a self-test. The About Atomlab 950 screen is then
displayed.
NOTE: If the system is in Simulation Mode, see System Setup later in this manual to return to normal operating
mode.
1. INTRODUCTION
2-7
SETUP INSTRUCTIONS
Содержание 187-130
Страница 8: ...1 INTRODUCTION SETUP INSTRUCTIONS 2 2 Figure 2 1 The MCA Uptake Stand ...
Страница 10: ...1 INTRODUCTION SETUP INSTRUCTIONS 2 4 Figure 2 2 The MCA Uptake Stand side view ...
Страница 20: ...1 INTRODUCTION SETUP INSTRUCTIONS 2 14 Figure 2 6 The System Setup Screen ...
Страница 22: ...1 INTRODUCTION SETUP INSTRUCTIONS 2 16 Figure 2 7 The Edit Physicians and Technologists Information Screen ...
Страница 25: ...1 INTRODUCTION 2 19 SETUP INSTRUCTIONS Figure 2 8 The Database Manager Screen ...
Страница 28: ...CONTENTS 3 3 ADMINISTRATION Figure 3 1 The Calibration Screen ...
Страница 29: ...1 INTRODUCTION Figure 3 2 A Calibration Report ADMINISTRATION 3 4 ...
Страница 31: ...1 INTRODUCTION Figure 3 3 The High Voltage Adjustment Screen ADMINISTRATION 3 6 ...
Страница 32: ...1 INTRODUCTION Figure 3 4 The High Voltage Report 3 7 ADMINISTRATION ...
Страница 34: ...1 INTRODUCTION Figure 3 5 The Chi Square Screen 3 9 ADMINISTRATION ...
Страница 35: ...1 INTRODUCTION Figure 3 6 The Chi Square Report ADMINISTRATION 3 10 ...
Страница 37: ...1 INTRODUCTION Figure 3 7 An Administration Report ADMINISTRATION 3 12 ...
Страница 39: ...ADMINISTRATION 3 14 1 INTRODUCTION Figure 3 8 The Isotope Editing Screen ...
Страница 40: ...1 INTRODUCTION 3 15 ADMINISTRATION Figure 3 9 The Select Isotope Window ...
Страница 42: ...1 INTRODUCTION 3 17 ADMINISTRATION Figure 3 10 The Detector Efficiency Screen ...
Страница 44: ...1 INTRODUCTION Figure 3 11 The Geometric Efficiency Window 3 19 ADMINISTRATION ...
Страница 48: ...1 INTRODUCTION 3 23 ADMINISTRATION Figure 3 13 A Spectrum Analysis Report ...
Страница 50: ...1 INTRODUCTION Figure 4 1 The Procedure Definition Screen THYROID UPTAKE 4 2 ...
Страница 51: ...1 INTRODUCTION 4 3 THYROID UPTAKE Figure 4 2 The Patient Definition Screen ...
Страница 56: ...THYROID UPTAKE 4 8 1 INTRODUCTION Figure 4 3 The Thyroid Uptake Screen ...
Страница 58: ...THYROID UPTAKE 4 10 1 INTRODUCTION Figure 4 4 A Thyroid Uptake Report ...
Страница 59: ...1 INTRODUCTION Figure 4 5 A Time Activity Report 4 11 THYROID UPTAKE ...
Страница 63: ...MANUAL MODE 5 2 1 INTRODUCTION Figure 5 1 The Manual Mode Screen ...
Страница 64: ...1 INTRODUCTION 5 3 MANUAL MODE Figure 5 2 A Manual Mode Report ...
Страница 66: ...1 INTRODUCTION WIPE TEST 6 2 Figure 6 1 The Wipe Counting Screen ...
Страница 67: ...6 3 WIPE TEST CONTENTS Figure 6 2 The Wipe Area Setup Screen ...
Страница 68: ...CONTENTS WIPE TEST 6 4 Figure 6 3 The Wipe Preferences Window ...
Страница 70: ...1 INTRODUCTION Figure 6 4 The Background LLD Screen WIPE TEST 6 6 ...
Страница 72: ...1 INTRODUCTION WIPE TEST 6 8 Figure 6 5 The Wipe Results Report ...
Страница 76: ...1 INTRODUCTION 7 3 BIOASSAY Figure 7 2 The Bioassay Preferences Screen ...
Страница 78: ...7 5 BIOASSAY CONTENTS Figure 7 3 An Individual Bioassay Report ...
Страница 79: ...CONTENTS Figure 7 4 An Employee Bioassay Summary BIOASSAY 7 6 ...
Страница 80: ...1 INTRODUCTION 7 7 BIOASSAY Figure 7 5 An Individual Bioassay History Summary ...
Страница 82: ...1 INTRODUCTION SCHILLING TESTS 8 2 Figure 8 1 Defining a Facility Standard Schilling Test ...
Страница 83: ...CONTENTS 8 3 SCHILLING TESTS Figure 8 2 The Schillings Counting Page ...
Страница 84: ...CONTENTS SCHILLING TESTS 8 4 Figure 8 3 A sample Schillings Mallinckrodt Report ...
Страница 87: ...CONTENTS 8 7 SCHILLING TESTS Figure 8 4 The Diopac Schillings Counting Page ...
Страница 88: ...SCHILLING TESTS 8 8 CONTENTS Figure 8 5 A Sample Diopac Schillings Report ...
Страница 90: ...CONTENTS HEMATOLOGY 9 2 9 1 The IHSA Counting Page ...
Страница 92: ...1 INTRODUCTION HEMATOLOGY 9 4 Figure 9 2 A Sample IHSA I 125 Test Report ...
Страница 93: ...CONTENTS 9 5 HEMATOLOGY Figure 9 3 The CR 51 Counting Page ...
Страница 95: ...CONTENTS 9 7 HEMATOLOGY Figure 9 4 A Sample Cr 51 Volume Test Report ...
Страница 96: ...CONTENTS Figure 9 5 The Cr 51 Red Blood Cell Survival Counting Page HEMATOLOGY 9 8 ...
Страница 98: ...CONTENTS HEMATOLOGY 9 10 Figure 9 6 A sample Cr 51 Survival Test Report ...
Страница 100: ...CONTENTS Figure 9 7 The GFR Counting Page HEMATOLOGY 9 12 ...
Страница 103: ...1 INTRODUCTION 9 15 HEMATOLOGY Figure 9 8 A One Sample Glomerular Filtration Rate Report ...
Страница 104: ...1 INTRODUCTION HEMATOLOGY 9 16 Figure 9 9 A Two Sample Glomerular Filtration Rate Report ...
Страница 106: ...1 INTRODUCTION HEMATOLOGY 9 18 Figure 9 10 The ERPF Counting Page ...
Страница 108: ...1 INTRODUCTION HEMATOLOGY 9 20 Figure 9 10 The ERPF Counting Page ...
Страница 109: ...1 INTRODUCTION 9 21 HEMATOLOGY Figure 9 11 An Effective Renal Plasma Flow Report ...